United Kingdom Data Center Construction Market Size (2024 - 2029)

The United Kingdom data center construction market is anticipated to experience growth, with significant increases in market size over the forecast period. The expansion is driven by the rising IT load capacity and the development of raised floor space. Additionally, the market is set to see a substantial number of racks installed, particularly concentrated in London. The connectivity of the United Kingdom is further enhanced by numerous submarine cable systems, with several projects underway to bolster global connections.

Market Size of United Kingdom Data Center Construction Industry

United Kingdom Data Center Construction Market Summary
Study Period 2019 - 2030
Base Year For Estimation 2023
Market Size (2024) USD 1.7 Billion
Market Size (2030) USD 3.60 Billion
CAGR (2024 - 2030) 13.96 %
Market Concentration Medium

Major Players

United Kingdom Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

United Kingdom Data Center Construction Market Analysis

The United Kingdom Data Center Construction Market size is estimated at USD 1.7 billion in 2024, and is expected to reach USD 3.60 billion by 2030, growing at a CAGR of 13.96% during the forecast period (2024-2030).

The UK data center market is experiencing robust growth, propelled by the widespread adoption of digital platforms, the expansion of 5G connectivity, a growing internet user base, surging data traffic, government support, and the integration of cutting-edge technologies such as IoT, big data, and AI.

  • The upcoming IT load capacity of the UK data center construction market is expected to reach around 4050 MW by 2030.
  •  The country's construction of raised floor area is expected to increase by 14.5 million sq. ft by 2030.
  • The country's total number of racks to be installed is expected to reach 726k units by 2030. London is projected to house the maximum number of racks by 2030.
  • There are close to 60 submarine cable systems connecting the United Kingdom to the world, and many are under construction. One such submarine cable, estimated to be built by 2027, is IOEMA, which stretches over 1,371 Kilometers spread across Denmark, Germany, the Netherlands, Norway with Dumpton Gap, and the United Kingdom.

United Kingdom Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The UK data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solution (PDU, transfer switches, switchgear, power panels and components, and other power distribution solutions)), power back-up solutions (UPS and generators), service - design and consulting, integration, and support and maintenance, mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling)), racks, and other mechanical infrastructure)), general construction, tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users). The market sizes and forecasts are provided in value (USD) for all the above segments.

Market Segmentation - By Infrastructure
Market Segmentation - By Electrical Infrastructure
Power Distribution Solution
PDU - Basic and Smart - Metered and Switched solutions
Transfer Switches
Static
Automatic (ATS)
Switchgear
Low Voltage
Medium Voltage
Power Panels and Components
Other Power Distribution Solutions
Power Back up Solutions
UPS
Generators
Service - Design and Consulting, Integration, and Support and Maintenance
Market Segmentation - By Mechanical Infrastructure
Cooling Systems
Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
Tier-I and-II
Tier-III
Tier-IV
Market Segmentation - By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region Or Segment?
Customize Now

United Kingdom Data Center Construction Market Size Summary

The United Kingdom data center construction market is experiencing a steady growth trajectory, driven by increasing demand for digital infrastructure and cloud services. The market is characterized by significant investments in data center facilities, particularly in London, which remains the primary hub for data center activities in the country. The digital economy's contribution to the UK's GDP underscores the growing need for advanced data processing capabilities, with cloud and telecom sectors holding substantial market shares. The government's digital strategy and substantial investments from major tech companies like Amazon Web Services further bolster the market's expansion, highlighting the UK's commitment to enhancing its digital infrastructure.

Despite London's dominance, there is a noticeable shift towards other regions such as Scotland, Manchester, and Wakefield, driven by the need for cost-effective solutions in power and cooling systems. This diversification is supported by the increasing adoption of digitalization across the UK, with cities like Bristol emerging as significant tech hubs. The market is fairly consolidated, with key players like Castrol Limited and Alfa Laval Ltd leading the charge. Recent developments, including new data center projects by firms like Datum Group and Glencar, are expected to create further opportunities for market vendors, ensuring continued growth and innovation in the UK's data center construction sector.

Explore More

United Kingdom Data Center Construction Market Size - Table of Contents

  1. 1. MARKET SEGMENTATION

    1. 1.1 Market Segmentation - By Infrastructure

      1. 1.1.1 Market Segmentation - By Electrical Infrastructure

        1. 1.1.1.1 Power Distribution Solution

          1. 1.1.1.1.1 PDU - Basic and Smart - Metered and Switched solutions

          2. 1.1.1.1.2 Transfer Switches

            1. 1.1.1.1.2.1 Static

            2. 1.1.1.1.2.2 Automatic (ATS)

          3. 1.1.1.1.3 Switchgear

            1. 1.1.1.1.3.1 Low Voltage

            2. 1.1.1.1.3.2 Medium Voltage

          4. 1.1.1.1.4 Power Panels and Components

          5. 1.1.1.1.5 Other Power Distribution Solutions

        2. 1.1.1.2 Power Back up Solutions

          1. 1.1.1.2.1 UPS

          2. 1.1.1.2.2 Generators

        3. 1.1.1.3 Service - Design and Consulting, Integration, and Support and Maintenance

      2. 1.1.2 Market Segmentation - By Mechanical Infrastructure

        1. 1.1.2.1 Cooling Systems

          1. 1.1.2.1.1 Immersion Cooling

          2. 1.1.2.1.2 Direct-to-Chip Cooling

          3. 1.1.2.1.3 Rear Door Heat Exchanger

          4. 1.1.2.1.4 In-row and In-rack Cooling

        2. 1.1.2.2 Racks

        3. 1.1.2.3 Other Mechanical Infrastructure

      3. 1.1.3 General Construction

    2. 1.2 Market Segmentation - By Tier Type

      1. 1.2.1 Tier-I and-II

      2. 1.2.2 Tier-III

      3. 1.2.3 Tier-IV

    3. 1.3 Market Segmentation - By End User

      1. 1.3.1 Banking, Financial Services, and Insurance

      2. 1.3.2 IT and Telecommunications

      3. 1.3.3 Government and Defense

      4. 1.3.4 Healthcare

      5. 1.3.5 Other End Users

United Kingdom Data Center Construction Market Size FAQs

The United Kingdom Data Center Construction Market size is expected to reach USD 1.7 billion in 2024 and grow at a CAGR of 13.96% to reach USD 3.60 billion by 2030.

In 2024, the United Kingdom Data Center Construction Market size is expected to reach USD 1.7 billion.

United Kingdom Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024 - 2030)