Taiwan Data Center Construction Market Size (2024 - 2029)

The Taiwan Data Center Construction Market is projected to experience significant growth over the forecast period, with its market size expanding considerably. This growth is driven by the development of IT load capacity, raised floor space, and the installation of racks, particularly concentrated in Taipei. Additionally, the construction of submarine cable systems is set to enhance connectivity, further contributing to the market's expansion.

Market Size of Taiwan Data Center Construction Industry

Taiwan Data Center Construction Market Summary
Study Period 2019 - 2030
Base Year For Estimation 2023
Market Size (2024) USD 0.87 Billion
Market Size (2030) USD 1.39 Billion
CAGR (2024 - 2030) 8.16 %
Market Concentration Medium

Major Players

Taiwan Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Taiwan Data Center Construction Market Analysis

The Taiwan Data Center Construction Market size is estimated at USD 0.87 billion in 2024, and is expected to reach USD 1.39 billion by 2030, growing at a CAGR of 8.16% during the forecast period (2024-2030).

Under Construction IT Load Capacity: The upcoming IT load capacity of the Taiwanese data center construction market is expected to reach more than 300 MW by 2030.

Under Construction Raised Floor Space: The country's construction of raised floor space is expected to increase by more than 1.5k sq. ft by 2030.

Planned Racks: The country's total number of racks to be installed is expected to reach more than 77,000 units by 2030.

Planned Submarine Cables: There are close to 14 submarine cable systems connecting Taiwan, and many are under construction.

Taiwan Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Taiwanese data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solution (PDU, transfer switches, switchgear, power panels and components, and other power distribution solutions)), power backup solution (UPS, generators), service – design & consulting, integration, support & maintenance)), mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, in-row and in-rack cooling)), racks, and other mechanical infrastructure)), and general construction)), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services & insurance, it and telecommunications, government & defense, healthcare, and other end users). The market sizes and forecasts are provided in USD value for all the above segments.

By Infrastructure
By Electrical Infrastructure
Power Distribution Solution
PDU - Basic & Smart - Metered & Switched solutions
Transfer Switches
Static
Automatic (ATS)
Switchgear
Low-Voltage
Medium-Voltage
Power Panels and Components
Other Power Distribution Solutions
Power Backup Solutions
UPS
Generators
Service - Design & Consulting, Integration, Support & Maintenance
By Mechanical Infrastructure
Cooling Systems
Immersion Cooling
Direct-To-Chip Cooling
Rear Door Heat Exchanger
In-Row and In-Rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
By Tier Type
Tier 1 and 2
Tier 3
Tier 4
By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region Or Segment?
Customize Now

Taiwan Data Center Construction Market Size Summary

The Taiwan Data Center Construction Market is poised for significant growth, driven by the increasing demand for digital infrastructure and the rapid adoption of advanced technologies such as 5G. Taipei stands out as a key hub for data center development, benefiting from its robust economic activities and substantial foreign investments. The city's strategic focus on sectors like ICT, biotechnology, and financial services, coupled with its large-scale data center facilities, positions it as a prime location for future expansions. The market is characterized by a consolidated landscape with major players like AECOM, Legrand, and M+W Group, who are actively involved in ongoing and upcoming projects. These developments are further supported by government initiatives and investments aimed at enhancing telecommunications infrastructure, which in turn fuels the demand for data centers.

The market's expansion is also influenced by the growing number of smartphone users and the increasing need for high-speed data access, particularly with the rollout of 5G services. The Taiwanese government's financial support for 5G infrastructure is expected to bolster the data center market, as telecom companies require enhanced storage and management capabilities to handle the surge in data traffic. Notable projects, such as those by Chunghwa Telecom and Empyrion DC, highlight the ongoing investments in data center construction, with significant capacities planned to meet the rising demand. As Taiwan continues to embrace digital transformation, the data center construction market is set to experience robust growth, aligning with global trends in data consumption and storage.

Explore More

Taiwan Data Center Construction Market Size - Table of Contents

  1. 1. MARKET SEGMENTATION

    1. 1.1 By Infrastructure

      1. 1.1.1 By Electrical Infrastructure

        1. 1.1.1.1 Power Distribution Solution

          1. 1.1.1.1.1 PDU - Basic & Smart - Metered & Switched solutions

          2. 1.1.1.1.2 Transfer Switches

            1. 1.1.1.1.2.1 Static

            2. 1.1.1.1.2.2 Automatic (ATS)

          3. 1.1.1.1.3 Switchgear

            1. 1.1.1.1.3.1 Low-Voltage

            2. 1.1.1.1.3.2 Medium-Voltage

          4. 1.1.1.1.4 Power Panels and Components

          5. 1.1.1.1.5 Other Power Distribution Solutions

        2. 1.1.1.2 Power Backup Solutions

          1. 1.1.1.2.1 UPS

          2. 1.1.1.2.2 Generators

        3. 1.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance

      2. 1.1.2 By Mechanical Infrastructure

        1. 1.1.2.1 Cooling Systems

          1. 1.1.2.1.1 Immersion Cooling

          2. 1.1.2.1.2 Direct-To-Chip Cooling

          3. 1.1.2.1.3 Rear Door Heat Exchanger

          4. 1.1.2.1.4 In-Row and In-Rack Cooling

        2. 1.1.2.2 Racks

        3. 1.1.2.3 Other Mechanical Infrastructure

      3. 1.1.3 General Construction

    2. 1.2 By Tier Type

      1. 1.2.1 Tier 1 and 2

      2. 1.2.2 Tier 3

      3. 1.2.3 Tier 4

    3. 1.3 By End User

      1. 1.3.1 Banking, Financial Services, and Insurance

      2. 1.3.2 IT and Telecommunications

      3. 1.3.3 Government and Defense

      4. 1.3.4 Healthcare

      5. 1.3.5 Other End Users

Taiwan Data Center Construction Market Size FAQs

The Taiwan Data Center Construction Market size is expected to reach USD 0.87 billion in 2024 and grow at a CAGR of 8.16% to reach USD 1.39 billion by 2030.

In 2024, the Taiwan Data Center Construction Market size is expected to reach USD 0.87 billion.

Taiwan Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)