Market Size of Singapore Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Market Size (2024) | USD 4.35 Billion |
Market Size (2030) | USD 5.75 Billion |
CAGR (2024 - 2030) | 4.76 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Singapore Data Center Construction Market Analysis
The Singapore Data Center Construction Market size is estimated at USD 4.35 billion in 2024, and is expected to reach USD 5.75 billion by 2030, growing at a CAGR of 4.76% during the forecast period (2024-2030).
- The upcoming IT load capacity in the region is expected to reach more than 1,100 MW by 2030 for construction IT load capacity.
- The construction of raised floor area for data centers in the region is expected to reach more than 5 million sq. ft by 2030 for under construction raised floor space.
- The region's total number of racks to be installed is expected to reach above 165,000 units by 2030, with East Singapore expected to house the maximum number of racks by that time for planned racks.
- The region is witnessing rising submarine cable projects. For instance, in April 2024, Viettel and Singtel signed a Memorandum of Understanding (MoU) to collaborate on a submarine cable project linking Singapore and Vietnam. Dubbed the Vietnam-Singapore Cable System (VTS), the cable is set for completion by Q2 2027. Singtel, the leading telco in Singapore, and Viettel Group, a telecom giant under Vietnam's military ownership, will jointly construct the cable. Each party will oversee the landing station in their respective nation. The cable, which has eight fiber pairs, is designed to achieve an extremely low latency of approximately 12 ms, establishing a new standard for connectivity between the two countries.
- Singapore holds a significant share of the Asia-Pacific data center market owing to its strong network infrastructure, pro-business environment, economic and political stability, low corporate tax rate, and low risk of natural disasters relative to other countries. Many data center operators like SpaceDC have built green data centers to support sustainability requirements. Space DC is based in Jakarta over a 1.8-hectare campus to house two data centers. In order to power the facility, the company uses natural gas to produce electricity. It is focused on local natural resources to create green energy and reduce its carbon footprint.
Singapore Data Center Construction Industry Segmentation
A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with them. Under data center construction, the capital expenditure incurred while building the existing data center facilities is tracked, and the future capex is estimated based on upcoming data center facilities.
The Singaporean data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solution (PDU, transfer switches, switchgear, power panels, and components)), power backup solution (UPS and generators), service - design and consulting, integration, and support and maintenance)), (mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling)), racks, and other mechanical infrastructure)), and general construction)), tier type (Tier 1 and 2, Tier 3, and Tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government, defense, healthcare, and other end users). The market size and forecasts are provided in value (USD) for all the above segments.
Market Segmentation - By Infrastructure | ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
General Construction |
Market Segmentation - By Tier Type | |
Tier 1 and 2 | |
Tier 3 | |
Tier 4 |
Market Segmentation - By End User | |
Banking, Financial Services, and Insurance | |
IT and Telecommunications | |
Government and Defense | |
Healthcare | |
Other End Users |
Singapore Data Center Construction Market Size Summary
The Singapore data center construction market is experiencing steady growth, driven by the expanding internet economy and the rapid adoption of cloud-based business operations. This growth is supported by Singapore's robust network infrastructure, favorable business environment, and strategic government initiatives such as Free Trade Zones, which offer tax and customs incentives. The market is also witnessing a shift towards sustainability, with operators like SpaceDC focusing on green data centers to reduce carbon footprints. The demand for data center capacity has surged post-pandemic, as companies increasingly adopt hybrid cloud environments, further stimulating construction activities in the region. The market is characterized by significant investments from major players, including hyperscale cloud providers like Google and Alibaba, which are enhancing the country's digital infrastructure.
The market is moderately consolidated, with key players such as Fortis Construction, ABB Ltd, and AECOM dominating the landscape. The tier 3 and 4 segments are expected to hold substantial market shares, with tier 4 facilities gaining traction due to their potential for efficient energy use and modern infrastructure. Despite challenges related to environmental impact and high construction costs, the market is poised for growth, supported by ongoing investments and technological advancements. Initiatives like the development of new data centers by Equinix, GDS, and Microsoft, along with partnerships exploring innovative energy solutions, are expected to drive further opportunities for vendors in the market.
Singapore Data Center Construction Market Size - Table of Contents
-
1. MARKET SEGMENTATION
-
1.1 Market Segmentation - By Infrastructure
-
1.1.1 Market Segmentation - By Electrical Infrastructure
-
1.1.1.1 Power Distribution Solution
-
1.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions
-
1.1.1.1.2 Transfer Switches
-
1.1.1.1.2.1 Static
-
1.1.1.1.2.2 Automatic (ATS)
-
-
1.1.1.1.3 Switchgear
-
1.1.1.1.3.1 Low-voltage
-
1.1.1.1.3.2 Medium-voltage
-
-
1.1.1.1.4 Power Panels and Components
-
1.1.1.1.5 Other Power Panels and Components
-
-
1.1.1.2 Power Backup Solutions
-
1.1.1.2.1 UPS
-
1.1.1.2.2 Generators
-
-
1.1.1.3 Service - Design and Consulting, Integration, and Support and Maintenance
-
-
1.1.2 Market Segmentation - By Mechanical Infrastructure
-
1.1.2.1 Cooling Systems
-
1.1.2.1.1 Immersion Cooling
-
1.1.2.1.2 Direct-to-chip Cooling
-
1.1.2.1.3 Rear Door Heat Exchanger
-
1.1.2.1.4 In-row and In-rack Cooling
-
-
1.1.2.2 Racks
-
1.1.2.3 Other Mechanical Infrastructure
-
-
1.1.3 General Construction
-
-
1.2 Market Segmentation - By Tier Type
-
1.2.1 Tier 1 and 2
-
1.2.2 Tier 3
-
1.2.3 Tier 4
-
-
1.3 Market Segmentation - By End User
-
1.3.1 Banking, Financial Services, and Insurance
-
1.3.2 IT and Telecommunications
-
1.3.3 Government and Defense
-
1.3.4 Healthcare
-
1.3.5 Other End Users
-
-
Singapore Data Center Construction Market Size FAQs
How big is the Singapore Data Center Construction Market?
The Singapore Data Center Construction Market size is expected to reach USD 4.35 billion in 2024 and grow at a CAGR of 4.76% to reach USD 5.75 billion by 2030.
What is the current Singapore Data Center Construction Market size?
In 2024, the Singapore Data Center Construction Market size is expected to reach USD 4.35 billion.