Market Size of Russia Data Center Construction Industry
Study Period | 2019 - 2030 |
Base Year For Estimation | 2023 |
Market Size (2024) | USD 3.95 Billion |
Market Size (2030) | USD 8.16 Billion |
CAGR (2024 - 2030) | 12.86 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Russia Data Center Construction Market Analysis
The Russia Data Center Construction Market size is estimated at USD 3.95 billion in 2024, and is expected to reach USD 8.16 billion by 2030, growing at a CAGR of 12.86% during the forecast period (2024-2030).
- Under Construction IT Load Capacity: The upcoming IT load capacity of the Russian data center construction market is expected to reach more than 1800 MW by 2030.
- Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by more than 4.3 million sq. ft by 2030.
- Planned Racks: The country's total number of racks to be installed is expected to reach more than 216.6K units by 2030. Moscow is expected to house the maximum number of racks by 2030.
- Planned Submarine Cables: There are ten submarine cable systems connecting Russia to the rest of the world. One such submarine cable that was built in 2022 is Petropavlovsk-Kamchatsky - Anadyr, which stretches over 2,173 kilometers with landing points in Anadyr, Russia, Petropavlovsk-Kamchatsky, Russia, and Ugolnye Kopi, Russia.
Russia Data Center Construction Industry Segmentation
Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.
The data center construction market in Russia is segmented by infrastructure (electrical infrastructure (power distribution solution (PDU, transfer switches, switchgear, power panels and components, and other power distribution solutions)), power backup solution (UPS, generators), service – design & consulting, integration, support & maintenance)), mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, in-row and in-rack cooling)), racks, and other mechanical infrastructure)), and general construction)), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services & insurance, it and telecommunications, government & defense, healthcare, and other end users). The market sizes and forecasts are provided in USD value for all the above segments.
By Infrastructure | ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
General Construction |
By Tier Type | |
Tier 1 and 2 | |
Tier 3 | |
Tier 4 |
By End User | |
Banking, Financial Services, and Insurance | |
IT and Telecommunications | |
Government and Defense | |
Healthcare | |
Other End Users |
Russia Data Center Construction Market Size Summary
The Russia data center construction market is experiencing significant growth, driven by the increasing demand for cloud services and advancements in technologies such as artificial intelligence, Big Data, and blockchain. The market is characterized by a robust expansion in IT load capacity and raised floor area, with Moscow emerging as a key hub due to its industrial and technological infrastructure. The city's strategic position as a major engineering center and its supportive government policies, including tax incentives, have attracted numerous global companies and fostered a thriving data center industry. Other cities like St. Petersburg, Novosibirsk, and Vladivostok are also witnessing growth, presenting further opportunities for data center development.
The market is semi-consolidated, with prominent players like Arup Group, Datadome, and Schneider Electric contributing to its expansion. Recent developments include the launch of new data centers and the construction of facilities with substantial rack capacities, indicating a strong pipeline of projects. Despite challenges such as the impact of the Ukraine conflict on the hardware supply chain, the market continues to grow, supported by the increasing adoption of cloud services and the need for infrastructure to support remote and hybrid work models. The ongoing expansion of submarine cable systems further enhances Russia's connectivity, bolstering the data center construction market's prospects.
Russia Data Center Construction Market Size - Table of Contents
-
1. MARKET SEGMENTATION
-
1.1 By Infrastructure
-
1.1.1 By Electrical Infrastructure
-
1.1.1.1 Power Distribution Solution
-
1.1.1.1.1 PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.1.2 Transfer Switches
-
1.1.1.1.2.1 Static
-
1.1.1.1.2.2 Automatic (ATS)
-
-
1.1.1.1.3 Switchgear
-
1.1.1.1.3.1 Low-Voltage
-
1.1.1.1.3.2 Medium-Voltage
-
-
1.1.1.1.4 Power Panels and Components
-
1.1.1.1.5 Other Power Distribution Solutions
-
-
1.1.1.2 Power Backup Solutions
-
1.1.1.2.1 UPS
-
1.1.1.2.2 Generators
-
-
1.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance
-
-
1.1.2 By Mechanical Infrastructure
-
1.1.2.1 Cooling Systems
-
1.1.2.1.1 Immersion Cooling
-
1.1.2.1.2 Direct-To-Chip Cooling
-
1.1.2.1.3 Rear Door Heat Exchanger
-
1.1.2.1.4 In-Row and In-Rack Cooling
-
-
1.1.2.2 Racks
-
1.1.2.3 Other Mechanical Infrastructure
-
-
1.1.3 General Construction
-
-
1.2 By Tier Type
-
1.2.1 Tier 1 and 2
-
1.2.2 Tier 3
-
1.2.3 Tier 4
-
-
1.3 By End User
-
1.3.1 Banking, Financial Services, and Insurance
-
1.3.2 IT and Telecommunications
-
1.3.3 Government and Defense
-
1.3.4 Healthcare
-
1.3.5 Other End Users
-
-
Russia Data Center Construction Market Size FAQs
How big is the Russia Data Center Construction Market?
The Russia Data Center Construction Market size is expected to reach USD 3.95 billion in 2024 and grow at a CAGR of 12.86% to reach USD 8.16 billion by 2030.
What is the current Russia Data Center Construction Market size?
In 2024, the Russia Data Center Construction Market size is expected to reach USD 3.95 billion.