Market Size of Poland Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Market Size (2024) | USD 0.96 Billion |
Market Size (2030) | USD 3.03 Billion |
CAGR (2024 - 2030) | 21.00 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Poland Data Center Construction Market Analysis
The Poland Data Center Construction Market size is estimated at USD 0.96 billion in 2024, and is expected to reach USD 3.03 billion by 2030, growing at a CAGR of 21% during the forecast period (2024-2030).
Factors influencing the growth of the Polish data center construction market include customer preferences for high-quality, reliable services, the construction of new facilities, provider consolidation, and the country's strategic location and favorable macroeconomic conditions.
- The upcoming IT load capacity in Poland is expected to reach 675 MW by 2030, which is projected to positively impact the demand for data center racks during the forecast period.
- The country's construction of raised floor area is expected to increase by 2.4 million sq. ft by 2030.
- The country's total number of racks to be installed is expected to reach 121,095 units by 2030. Warsaw is projected to house the maximum number of racks by 2030.
- Poland is connected by a single cable system, the Baltica, established in 1997. This submarine cable spans 437 km, linking Kolobrzeg, Poland.
Poland Data Center Construction Industry Segmentation
Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.
The Polish data center construction market is segmented by infrastructure (electrical infrastructure [power distribution solutions (PDUs, transfer switches, switchgear, power panels and components, and other power distribution solutions), power backup solutions (UPS and generators), and services (design and consulting, integration, and support and maintenance)], mechanical infrastructure [cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructures], and general construction), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services, and insurance, IT and telecommunications, government and defense, healthcare, and other end users). The market sizes and forecasts are provided in terms of value (USD) for the above segments.
Market Segmentation - By Infrastructure | ||||||||||||||||||||
| ||||||||||||||||||||
|
Market Segmentation - By Tier Type | |
Tier-I and-II | |
Tier-III | |
Tier-IV |
Market Segmentation - By End User | |
Banking, Financial Services, and Insurance | |
IT and Telecommunications | |
Government and Defense | |
Healthcare | |
Other End Users |
Poland Data Center Construction Market Size Summary
The Poland data center construction market is experiencing significant growth, driven by increasing demand across various sectors such as media and entertainment, manufacturing, BFSI, e-commerce, and government services. The rise in digital services and e-government initiatives is expected to further boost demand, particularly in Warsaw, which is the primary hub for data center activities in the country. The city's strategic initiatives, like the Digital Transformation Policy, aim to enhance technological infrastructure and digital services, thereby stimulating the need for advanced data processing and storage facilities. The market is also witnessing expansion in other cities like Krakow and Wroclaw, which offer cost-effective commercial land and a skilled workforce, contributing to the overall growth of the data center market in Poland.
The market is moderately consolidated, with key players such as Turner & Townsend, STULZ, AECOM, Legrand, and Arup actively participating in the development of data center infrastructure. Recent developments include Atman's acquisition of land for a new data center and the expansion of its existing facilities, indicating ongoing investment in the sector. The increasing value of non-cash transactions and the growing inclination towards cloud services underscore the rising data consumption, further propelling the demand for data centers. As the market continues to evolve, the focus on cloud and telecom services is expected to dominate, with significant contributions to the market share during the forecast period.
Poland Data Center Construction Market Size - Table of Contents
-
1. MARKET SEGMENTATION
-
1.1 Market Segmentation - By Infrastructure
-
1.1.1 Market Segmentation - By Electrical Infrastructure
-
1.1.1.1 Power Distribution Solution
-
1.1.1.1.1 PDUs - Basic and Smart - Metered and Switched Solutions
-
1.1.1.1.2 Transfer Switches
-
1.1.1.1.2.1 Static
-
1.1.1.1.2.2 Automatic (ATS)
-
-
1.1.1.1.3 Switchgear
-
1.1.1.1.3.1 Low-voltage
-
1.1.1.1.3.2 Medium-voltage
-
-
1.1.1.1.4 Power Panels and Components
-
1.1.1.1.5 Others
-
-
1.1.1.2 Power Backup Solutions
-
1.1.1.2.1 UPS
-
1.1.1.2.2 Generators
-
-
1.1.1.3 Service (Design and Consulting, Integration, and Support and Maintenance)
-
-
1.1.2 Market Segmentation - By Mechanical Infrastructure
-
1.1.2.1 Cooling Systems
-
1.1.2.1.1 Immersion Cooling
-
1.1.2.1.2 Direct-to-chip Cooling
-
1.1.2.1.3 Rear Door Heat Exchanger
-
1.1.2.1.4 In-row and In-rack Cooling
-
1.1.2.1.5 Other Mechanical Infrastructures
-
-
1.1.2.2 Racks
-
1.1.2.3 Other Mechanical Infrastructures
-
-
-
1.2 Market Segmentation - By Tier Type
-
1.2.1 Tier-I and-II
-
1.2.2 Tier-III
-
1.2.3 Tier-IV
-
-
1.3 Market Segmentation - By End User
-
1.3.1 Banking, Financial Services, and Insurance
-
1.3.2 IT and Telecommunications
-
1.3.3 Government and Defense
-
1.3.4 Healthcare
-
1.3.5 Other End Users
-
-
Poland Data Center Construction Market Size FAQs
How big is the Poland Data Center Construction Market?
The Poland Data Center Construction Market size is expected to reach USD 0.96 billion in 2024 and grow at a CAGR of 21% to reach USD 3.03 billion by 2030.
What is the current Poland Data Center Construction Market size?
In 2024, the Poland Data Center Construction Market size is expected to reach USD 0.96 billion.