
Study Period | 2019 - 2031 |
Base Year For Estimation | 2024 |
Forecast Data Period | 2025 - 2031 |
Market Size (2025) | USD 1.16 Billion |
Market Size (2031) | USD 3.65 Billion |
CAGR (2025 - 2031) | 21.00 % |
Market Concentration | Medium |
Major Players![]() *Disclaimer: Major Players sorted in no particular order |
Poland Data Center Construction Market Analysis
The Poland Data Center Construction Market size is estimated at USD 1.16 billion in 2025, and is expected to reach USD 3.65 billion by 2031, at a CAGR of 21% during the forecast period (2025-2031).
Factors influencing the growth of the Polish data center construction market include customer preferences for high-quality, reliable services, the construction of new facilities, provider consolidation, and the country's strategic location and favorable macroeconomic conditions.
- The upcoming IT load capacity in Poland is expected to reach 675 MW by 2030, which is projected to positively impact the demand for data center racks during the forecast period.
- The country's construction of raised floor area is expected to increase by 2.4 million sq. ft by 2030.
- The country's total number of racks to be installed is expected to reach 121,095 units by 2030. Warsaw is projected to house the maximum number of racks by 2030.
- Poland is connected by a single cable system, the Baltica, established in 1997. This submarine cable spans 437 km, linking Kolobrzeg, Poland.
Poland Data Center Construction Market Trends
IT and Telecom to Register a Significant Market Share
- By 2029, the market share for cloud services as an end user is projected to rise to approximately 24%, up from 23.12% in 2022. In 2022, the cloud category operated at an IT load capacity of 39.28 MW. This capacity is set to grow, reaching 47.15 MW in 2023 and a substantial 125.46 MW by 2029, marking a notable CAGR of 17.7%. Cloud infrastructure has proven effective, reducing companies' downtime by 57% and data breaches by 26%.
- Online shopping events have seen a significant uptick in website traffic, often overwhelming company servers and causing website crashes. However, companies that have embraced cloud services find themselves better equipped to handle these traffic spikes, ensuring smooth operations, especially during monetary transactions.
- The retail sector is emerging as a frontrunner in cloud service adoption, with projections indicating an annual value of USD 2.3 billion by 2030. Furthermore, as the retail sector in Poland embraces cloud technology infrastructure, it is poised to contribute 3.3% to the country's GDP by 2030. These trends underscore this sector's escalating demand for data center server computational power.
- In terms of telecom, since the commercial debut of 5G in 2020, operators have prioritized expanding 5G coverage and enhancing package offerings. Notably, all major national players, such as Orange, Play, Plus, and T-Mobile, have rolled out their 5G services. In a significant move, Operator Plus Poland unveiled '5G Ultra' in June 2023, a gigabit 5G service leveraging spectrum aggregation. Back in 2021, T-Mobile Poland boasted a 25% 5G coverage across the nation.
- With 4G now offering speeds of up to 44 Mbps, mobile data consumption has surged to 13.1 GB per month. Forecasts suggest this figure will climb from 14.6 GB in 2023 to a projected 26.7 GB by 2029. This growth is being fueled by the rising popularity of cashless payments, online banking, streaming services, and e-commerce.
- Such instances in the market may create more need for data in the coming years. This surge in data storage demand is poised to elevate the need for data centers in the region, thereby bolstering the prospects of data center construction firms in the coming years.
Tier 3 is Expected to Hold a Major Share of the Market Studied
- In 2023, the country boasted nearly 25 tier 3-compliant facilities, each capable of handling an IT load of up to 160 MW. The demand for tier 3 data centers is primarily fueled by their reliability and affordability. Projections indicate this demand is set to surge, with a CAGR of approximately 11.6%, pushing the total capacity to over 340 MW by 2030.
- Most data center facilities in the region cater to small, medium, and large enterprises. Out of the 25 facilities, 11 are concentrated in Warsaw, the nation's economic hub and a leading hotspot for data centers.
- Furthermore, more than five data center facilities are under construction, with tier 3 standards expected to come during the study period. Major players involved in tier 3 DC construction are EdgeConnex, LIMDC, and Data4. Construction is projected to be concentrated in Warsaw.
- In May 2023, Data4, a prominent European data center operator, unveiled its latest venture, a new data center campus situated just outside Warsaw, Poland. Upon completion, this sprawling campus, spanning four hectares, will boast a capacity of 60 MW and encompass 15,000 sq. m, spread across four distinct buildings.
- The rise of smart cities and connected networks is driving the demand for tier 3 data centers. In a recent move, Tychy in Poland rolled out an advanced Intelligent Transport System (ITS) to bolster its real-time traffic monitoring capabilities. As these smart initiatives generate vast data streams, the need for tier 3 and tier 4 data centers, known for their heightened reliability and uptime, is set to surge in tandem.
- Such instances in the Polish market are expected to drive demand for tier 3-certified facilities. This surge in demand, specifically from the tier 3 segment, is expected to bolster the need for data center construction services in the future.

Poland Data Center Construction Industry Overview
The Polish data center construction market is moderately consolidated. Some of the major players in the market include AECOM, Jacobs, Turner & Townsend, Skanska, and PORR AG.
Poland Data Center Construction Market Leaders
-
AECOM
-
Jacobs
-
Turner & Townsend
-
Skanska
-
PORR AG
- *Disclaimer: Major Players sorted in no particular order

Poland Data Center Construction Market News
- April 2024: Atman secured PLN 1.35 billion (~USD 345 million) in funding to advance its projects in Poland. The primary focus of this funding is the expansion of Atman's WAW-3 DC campus, which saw its groundbreaking in October 2023. Situated in Duchnice, just outside Warsaw, this data center is slated to encompass three buildings, offering a combined colocation area of nearly 19,000 sq. m (204,515 sq. ft) spread across 36 data halls. Once completed, it is expected to boast a capacity of 43 MW, capable of accommodating 50,000 servers.
- January 2023: Atman, a prominent data center operator in Poland, announced its plans to enhance its presence in Warsaw by expanding its Warsaw-1 campus. The upcoming F7 building will boast a substantial 7.2 MW capacity, spread over 2,916 sq. m (31,390 sq. ft). Each of its 12 data rooms will be generously equipped with 600 kW. Situated at 21 A Grochowska Street, construction at the campus is already underway, with the building slated for completion by 2025.
Poland Data Center Construction Industry Segmentation
Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.
The Polish data center construction market is segmented by infrastructure (electrical infrastructure [power distribution solutions (PDUs, transfer switches, switchgear, power panels and components, and other power distribution solutions), power backup solutions (UPS and generators), and services (design and consulting, integration, and support and maintenance)], mechanical infrastructure [cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructures], and general construction), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services, and insurance, IT and telecommunications, government and defense, healthcare, and other end users). The market sizes and forecasts are provided in terms of value (USD) for the above segments.
Market Segmentation - By Infrastructure | Market Segmentation - By Electrical Infrastructure | Power Distribution Solution | PDUs - Basic and Smart - Metered and Switched Solutions | |
Transfer Switches | Static | |||
Automatic (ATS) | ||||
Switchgear | Low-voltage | |||
Medium-voltage | ||||
Power Panels and Components | ||||
Others | ||||
Power Backup Solutions | UPS | |||
Generators | ||||
Service (Design and Consulting, Integration, and Support and Maintenance) | ||||
Market Segmentation - By Mechanical Infrastructure | Cooling Systems | Immersion Cooling | ||
Direct-to-chip Cooling | ||||
Rear Door Heat Exchanger | ||||
In-row and In-rack Cooling | ||||
Other Mechanical Infrastructures | ||||
Racks | ||||
Other Mechanical Infrastructures | ||||
Market Segmentation - By Tier Type | Tier-I and-II | |||
Tier-III | ||||
Tier-IV | ||||
Market Segmentation - By End User | Banking, Financial Services, and Insurance | |||
IT and Telecommunications | ||||
Government and Defense | ||||
Healthcare | ||||
Other End Users |
Poland Data Center Construction Market Research Faqs
How big is the Poland Data Center Construction Market?
The Poland Data Center Construction Market size is expected to reach USD 1.16 billion in 2025 and grow at a CAGR of 21% to reach USD 3.65 billion by 2031.
What is the current Poland Data Center Construction Market size?
In 2025, the Poland Data Center Construction Market size is expected to reach USD 1.16 billion.
Who are the key players in Poland Data Center Construction Market?
AECOM, Jacobs, Turner & Townsend, Skanska and PORR AG are the major companies operating in the Poland Data Center Construction Market.
What years does this Poland Data Center Construction Market cover, and what was the market size in 2024?
In 2024, the Poland Data Center Construction Market size was estimated at USD 0.92 billion. The report covers the Poland Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022, 2023 and 2024. The report also forecasts the Poland Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.
Our Best Selling Reports
Poland Data Center Construction Industry Report
Statistics for the 2025 Poland Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Poland Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.