North America Data Center Construction Market Size (2024 - 2029)

The North American data center construction market is experiencing growth driven by the increasing demand for cloud computing, IoT, AI, and big data. The region's strong economy and advanced network infrastructure contribute to its dominance in the global market. The United States, in particular, leads in data center construction due to its high internet penetration and significant investment in new technologies. The rise of edge computing and the impact of 5G are also influencing the market, as they reduce reliance on traditional data centers. Additionally, the COVID-19 pandemic has accelerated the shift towards cloud solutions, further boosting the market's expansion.

North America Data Center Construction Market Size & Share Analysis - Growth, Trend, and forecasts (2025 - 2031)

North America Data Center Construction Market Size

Study Period 2019 - 2030
Base Year For Estimation 2023
Forecast Data Period 2024 - 2030
Market Size (2024) USD 22.40 Billion
Market Size (2030) USD 34.60 Billion
CAGR (2024 - 2030) 6.20 %
Market Concentration Medium

Major Players

*Disclaimer: Major Players sorted in no particular order

North America Data Center Construction Market Analysis

The North America Data Center Construction Market size is estimated at USD 22.40 billion in 2024, and is expected to reach USD 34.60 billion by 2030, growing at a CAGR of 6.20% during the forecast period (2024-2030).

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the North American data center market is expected to reach above 25,000 MW by 2030.
  • Under Construction Raised Floor Space: The country's construction of raised floor areas is expected to exceed 85 million sq. ft. by 2030.
  • Planned Racks: The region's total number of racks to be installed is expected to reach more than 4 million units by 2030. The United States is expected to house the maximum number of racks by 2030.
  • Planned Submarine Cables: Close to 100 submarine cable systems connect North America, and many are under construction. One such cable, GigNet-1, started its service in 2023. It stretches over 1,104 kilometers and has landing points in Boca Raton, United States.
  • North America dominates the global market for building data centers. A strong economy and cutting-edge network infrastructure drive the market's expansion. The United States dominates the regional market and has many significant cloud service providers, including Amazon.com, Google Inc., and Facebook. These businesses invest in building massive data centers and increased data storage and processing capabilities, which present enormous market prospects.

North America Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The North American data center construction market is segmented (by infrastructure (electrical infrastructure (power distribution solution(pdu, transfer switches, switchgear, power panels and components, others)), power back-up solution (ups, generators), service – design & consulting, integration, support & maintenance)), (mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, in-row and in-rack cooling)), racks, other mechanical infrastructure)), general construction)), by tier type (tier 1 and 2, tier 3, and tier 4), by end user (banking, financial services and insurance, it and telecommunications, government and defense, healthcare, and other end users), and geography (united states, canada, and mexico).The market sizes and forecasts are provided in USD values for all the above segments.

Market Segmentation - By Infrastructure
Market Segmentation - By Electrical Infrastructure Power Distribution Solution PDU - Basic & Smart - Metered & Switched solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-Voltage
Medium-Voltage
Power Panels and Components
Others
Power Back up Solutions UPS
Generators
Service - Design & Consulting, Integration, Support & Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-To-Chip Cooling
Rear Door Heat Exchanger
In-Row and In-Rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
Tier-I and II
Tier-III
Tier-IV
Market Segmentation - By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Market Segmentation - By Geography
United States
Canada
Mexico
Need A Different Region or Segment?
Customize Now

North America Data Center Construction Market Size Summary

The North American Data Center Construction Market is experiencing robust growth, driven by the increasing demand for cloud computing, IoT, AI, and big data. The region's advanced network infrastructure and strong economic conditions position it as a leader in the global market. The United States, in particular, is at the forefront, with significant investments from major tech companies like Amazon, Google, and Facebook, who are expanding their data storage and processing capabilities. The rise in internet usage and the adoption of new technologies have further fueled the need for data centers, with metro infrastructure investments providing additional opportunities for expansion. The impact of edge computing and the introduction of 5G are also expected to influence data center construction, reducing reliance on traditional hyperscale centers.

The United States data center construction market is characterized by substantial investments from IT giants and favorable government incentives, such as tax breaks, which attract data center projects. Metropolitan areas like New York, Los Angeles, and Chicago are key hubs due to the presence of large enterprises and cloud service providers. The healthcare sector is anticipated to drive significant demand for data center construction, propelled by the digitization of healthcare records and the need for enhanced data security. Government initiatives and increased healthcare expenditure further support technological advancements in the sector. The market is moderately fragmented, with major players like AECOM, DPR Construction Inc., and IBM Corporation leading the charge, while ongoing projects and strategic agreements continue to create opportunities for growth.

Explore More

North America Data Center Construction Market Size - Table of Contents

1. MARKET SEGMENTATION

  • 1.1 Market Segmentation - By Infrastructure
    • 1.1.1 Market Segmentation - By Electrical Infrastructure
    • 1.1.1.1 Power Distribution Solution
    • 1.1.1.1.1 PDU - Basic & Smart - Metered & Switched solutions
    • 1.1.1.1.2 Transfer Switches
    • 1.1.1.1.2.1 Static
    • 1.1.1.1.2.2 Automatic (ATS)
    • 1.1.1.1.3 Switchgear
    • 1.1.1.1.3.1 Low-Voltage
    • 1.1.1.1.3.2 Medium-Voltage
    • 1.1.1.1.4 Power Panels and Components
    • 1.1.1.1.5 Others
    • 1.1.1.2 Power Back up Solutions
    • 1.1.1.2.1 UPS
    • 1.1.1.2.2 Generators
    • 1.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance
    • 1.1.2 Market Segmentation - By Mechanical Infrastructure
    • 1.1.2.1 Cooling Systems
    • 1.1.2.1.1 Immersion Cooling
    • 1.1.2.1.2 Direct-To-Chip Cooling
    • 1.1.2.1.3 Rear Door Heat Exchanger
    • 1.1.2.1.4 In-Row and In-Rack Cooling
    • 1.1.2.2 Racks
    • 1.1.2.3 Other Mechanical Infrastructure
    • 1.1.3 General Construction
  • 1.2 Market Segmentation - By Tier Type
    • 1.2.1 Tier-I and II
    • 1.2.2 Tier-III
    • 1.2.3 Tier-IV
  • 1.3 Market Segmentation - By End User
    • 1.3.1 Banking, Financial Services, and Insurance
    • 1.3.2 IT and Telecommunications
    • 1.3.3 Government and Defense
    • 1.3.4 Healthcare
    • 1.3.5 Other End Users
  • 1.4 Market Segmentation - By Geography
    • 1.4.1 United States
    • 1.4.2 Canada
    • 1.4.3 Mexico

North America Data Center Construction Market Research FAQs

How big is the North America Data Center Construction Market?

The North America Data Center Construction Market size is expected to reach USD 23.79 billion in 2025 and grow at a CAGR of 6.20% to reach USD 34.13 billion by 2031.

What is the current North America Data Center Construction Market size?

In 2025, the North America Data Center Construction Market size is expected to reach USD 23.79 billion.

North America Data Center Construction Market Report Snapshots