New Zealand Data Center Construction Market Size (2024 - 2029)

The New Zealand data center construction market is experiencing growth driven by increased reliance on cloud environments and the expansion of hybrid cloud solutions. Government initiatives, such as the construction of a significant data center at an Auckland air force base, are expected to enhance market opportunities. Despite challenges related to environmental impacts, high construction costs, and supply chain disruptions from the pandemic, the market is poised for expansion. The introduction of open banking and the growing maturity of organizations in managing cloud infrastructures further contribute to the market's positive outlook.

Market Size of New Zealand Data Center Construction Industry

New Zealand Data Center Construction Market Summary
Study Period 2019 - 2029
Base Year For Estimation 2023
Market Size (2024) USD 0.67 Billion
Market Size (2030) USD 1.75 Billion
CAGR (2024 - 2030) 17.21 %
Market Concentration Medium

Major Players

New Zealand Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

New Zealand Data Center Construction Market Analysis

The New Zealand Data Center Construction Market size is estimated at USD 0.67 billion in 2024, and is expected to reach USD 1.75 billion by 2030, growing at a CAGR of 17.21% during the forecast period (2024-2030).

  • The upcoming IT load capacity in the region is expected to reach more than 300 MW by 2030 for under construction IT load capacity.
  • The construction of raised floor area for data centers in the region is expected to reach more than 0.8 million sq. ft by 2030 for under construction raised floor space.
  • The region's total number of racks to be installed is expected to reach above 35,000 units by 2030, with Auckland expected to house the maximum number of racks by that time for planned racks.
  • The region is witnessing rising submarine cable projects. For instance, in January 2024, Intelia New Zealand has unveiled the Te Waipounamu submarine cable project, connecting Invercargill to Sydney and Melbourne. Spanning 3,000 km, the system boasts 16 fiber pairs: 4 pairs from Invercargill to Australia, each providing a robust 120 Tbps capacity, and 2 pairs linking Sydney and Melbourne, each with a capacity of 35 Tbps. Such initiatives are expected to provide more opportunities for the vendors studied in the market.
  • Furthermore, New Zealand aims to introduce open banking by 2025, making the sector the first to give consumers full control of their financial data. Proponents of "open banking" say it may allow consumers to share their banking data with other providers to get better and cheaper services than they already have. Australian banks, which dominate New Zealand's banking sector, are increasing their reliance on data to approve loans and better sharing of data to support this. The ability to automate large parts of loan processing is considered a way to cut costs by banks, which are a headwind due to rising interest rates and staff wages.

New Zealand Data Center Construction Industry Segmentation

A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.

The New Zealand Data Center Construction Market is segmented (by Infrastructure (Electrical Infrastructure (Power Distribution Solution(PDU, Transfer Switches, Switchgear, Power Panels and Components, others)), Power Back-up Solution (UPS, Generators), Service – Design & Consulting, Integration, Support & Maintenance)), (Mechanical Infrastructure (Cooling Systems (Immersion Cooling, Direct-to-Chip Cooling, Rear Door Heat Exchanger, In-Row and In-Rack Cooling)), Racks, Other Mechanical Infrastructure)), General Construction)), by Tier Type (Tier 1 and 2, Tier 3, and Tier 4), by End User (Banking, Financial Services and Insurance, IT and Telecommunications, Government and Defense, Healthcare, and Other End User). The market sizes and forecasts are provided in values of USD for all the above segments.

Market Segmentation - By Infrastructure
Market Segmentation - By Electrical Infrastructure
Power Distribution Solution
PDU - Basic & Smart - Metered & Switched solutions
Transfer Switches
Static
Automatic (ATS)
Switchgear
Low-Voltage
Medium-Voltage
Power Panels and Components
Others
Power Back up Solutions
UPS
Generators
Service - Design & Consulting, Integration, Support & Maintenance
Market Segmentation - By Mechanical Infrastructure
Cooling Systems
Immersion Cooling
Direct-To-Chip Cooling
Rear Door Heat Exchanger
In-Row and In-Rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
Tier-I and II
Tier-III
Tier-IV
Market Segmentation - By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region Or Segment?
Customize Now

New Zealand Data Center Construction Market Size Summary

The New Zealand data center construction market is poised for significant growth, driven by increasing demand for advanced data infrastructure and the adoption of cloud-based solutions. The market is experiencing a shift towards Tier 3 and Tier 4 data centers, which offer enhanced capabilities to support uninterrupted business services and cater to the rising need for robust data management. The introduction of 5G networks and the government's Ultra-Fast Broadband Initiative are further propelling the demand for data centers, as they facilitate faster and more reliable internet connectivity. These developments are expected to create lucrative opportunities for market players, despite challenges related to environmental impacts and high construction costs.

The market landscape is fairly consolidated, with major players like AECOM, Arup, Aurecon, Cyber Power Systems, and EcoCooling dominating the scene. Recent initiatives, such as the government's announcement of a substantial data center project at the Auckland air force base and the completion of a cloud data center by DCI Data Center, highlight the ongoing investments in the sector. These projects are anticipated to provide new opportunities for vendors and contribute to the market's expansion. Additionally, the pandemic-induced surge in internet traffic and the subsequent shift towards hybrid cloud environments have revitalized the market, underscoring the critical role of data centers in supporting digital transformation across various industries in New Zealand.

Explore More

New Zealand Data Center Construction Market Size - Table of Contents

  1. 1. MARKET SEGMENTATION

    1. 1.1 Market Segmentation - By Infrastructure

      1. 1.1.1 Market Segmentation - By Electrical Infrastructure

        1. 1.1.1.1 Power Distribution Solution

          1. 1.1.1.1.1 PDU - Basic & Smart - Metered & Switched solutions

          2. 1.1.1.1.2 Transfer Switches

            1. 1.1.1.1.2.1 Static

            2. 1.1.1.1.2.2 Automatic (ATS)

          3. 1.1.1.1.3 Switchgear

            1. 1.1.1.1.3.1 Low-Voltage

            2. 1.1.1.1.3.2 Medium-Voltage

          4. 1.1.1.1.4 Power Panels and Components

          5. 1.1.1.1.5 Others

        2. 1.1.1.2 Power Back up Solutions

          1. 1.1.1.2.1 UPS

          2. 1.1.1.2.2 Generators

        3. 1.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance

      2. 1.1.2 Market Segmentation - By Mechanical Infrastructure

        1. 1.1.2.1 Cooling Systems

          1. 1.1.2.1.1 Immersion Cooling

          2. 1.1.2.1.2 Direct-To-Chip Cooling

          3. 1.1.2.1.3 Rear Door Heat Exchanger

          4. 1.1.2.1.4 In-Row and In-Rack Cooling

        2. 1.1.2.2 Racks

        3. 1.1.2.3 Other Mechanical Infrastructure

      3. 1.1.3 General Construction

    2. 1.2 Market Segmentation - By Tier Type

      1. 1.2.1 Tier-I and II

      2. 1.2.2 Tier-III

      3. 1.2.3 Tier-IV

    3. 1.3 Market Segmentation - By End User

      1. 1.3.1 Banking, Financial Services, and Insurance

      2. 1.3.2 IT and Telecommunications

      3. 1.3.3 Government and Defense

      4. 1.3.4 Healthcare

      5. 1.3.5 Other End Users

New Zealand Data Center Construction Market Size FAQs

The New Zealand Data Center Construction Market size is expected to reach USD 0.67 billion in 2024 and grow at a CAGR of 17.21% to reach USD 1.75 billion by 2030.

In 2024, the New Zealand Data Center Construction Market size is expected to reach USD 0.67 billion.

New Zealand Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024 - 2029)