Netherlands Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2025 - 2031)

The Netherlands Data Center Construction Market report segments the industry into By Tier Type (Tier 1 and 2, Tier 3, Tier 4), By Data Center Size (Small, Medium, Large, Mega, Massive), By Infrastructure (Cooling Infrastructure, Power Infrastructure, Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, and more), and By End User (IT & Telecommunication, BFSI, Government, Healthcare, and more).

Netherlands Data Center Construction Market Size and Share

Netherlands Data Center Construction Market Summary
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Netherlands Data Center Construction Market Analysis by Mordor Intelligence

The Netherlands Data Center Construction Market size is estimated at USD 1.26 billion in 2025, and is expected to reach USD 1.66 billion by 2031, at a CAGR of 4.75% during the forecast period (2025-2031).

  • The upcoming IT load capacity of the Dutch data center construction market is expected to reach more than 1490.2 MW by 2030. The country's construction of raised floor area is expected to increase by more than 6.7 million sq. ft by 2030.
  • The country's total number of racks to be installed is expected to be nearly 338,134 units by 2030. Amsterdam will likely house the maximum number of racks by 2030. There are close to 10 submarine cable systems connecting the Netherlands, and many are under construction. One such submarine cable, built in 2022, is BT North Sea, with landing points in Callantsoog, Netherlands.
  • The demand for the data center construction market in the country is being driven by factors such as a surge in cloud computing. The government regulations for data security and the increasing presence of foreign cloud vendors are contributing to this demand. According to Cloudscene, as of September 2023, there were 299 data centers in the Netherlands.
  • Furthermore, due to technological advancements, companies are now more focused on reducing power consumption to enhance efficiency, cut costs, and meet the rising demand for efficient facility systems. In August 2023, Microsoft was granted approval to construct a new data center in the Hollands Kroon region of the Netherlands. The facility is situated on 14.4 hectares within the Agriport Business Park. There are two separate buildings within the development, each capable of holding 36MW of power. These buildings, known as AMS13 and AMS1, are equipped with a total of five data halls.
  • The data center construction market in the country is experiencing rapid growth but is also facing challenges such as supply chain bottlenecks, longer lead times for crucial components, increased and fluctuating commodity prices, and escalating inflationary pressures. Moreover, data security has become a rising concern in the market studied due to the rise in cyber attacks and natural disasters.

Note: Market size and forecast figures in this report are generated using Mordor Intelligence’s proprietary estimation framework, updated with the latest available data and insights as of January 2026.

600+
data center reports by Mordor Intelligence
covering AI facilities, servers - global, regional or country-level, right down to individual data center components
See more reports  ↓

Competitive Landscape

The Dutch data center construction market is semi consolidated. Significant companies include AECOM, DPR Construction, Legrand, Kirby Group, Coromatic AB Sweden, IBM Corporation, Schneider Electric SE, and STULZ.

  • In November 2023, QTS Data Centers, a company that specializes in hyperscale, enterprise, and government data center solutions, acquired Zentrys, a data center management and operations company based out of the Netherlands.
  • In June 2023, Digital Realty acquired more land to build data centers in Amsterdam. The company aims to build a data center with 40 MW interconnected with Digital Realty's existing Schiphol facilities. Such developments are expected to drive opportunities for the vendors in the market.

Netherlands Data Center Construction Industry Leaders

  1. DPR Construction

  2. Legrand Netherlands

  3. Stulz Group BV

  4. Schneider Electric

  5. Kirby Group

  6. *Disclaimer: Major Players sorted in no particular order
Netherlands Data Center Construction Market Concentration
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Recent Industry Developments

  • April 2024: Alphabet’s Google outlined plans to spend €600 million on a new data centre in the Netherlands, adding to almost €4 billion invested on expanding its Dutch infrastructure over the past decade.The technology giant stated the new data centre will be located in the Westpoort business park in the municipality of Groningen and construction is already underway.
  • December 2023: Google started construction of a new data center in Winschoten, Groningen (Netherlands). The company plans to invest EUR 600 million (USD 655.1 million) into the new data center construction project situated at Hoogebrug 3.

Table of Contents for Netherlands Data Center Construction Industry Report

1. INTRODUCTION

  • 1.1 Study Assumption and Market Definition
  • 1.2 Scope of the Study

2. Research Methodology

3. Executive Summary

4. Market Dynamics

  • 4.1 Market Overview
  • 4.2 Market Drivers
    • 4.2.1 5G Developments Fuelling Data Center Investments
    • 4.2.2 Growing Cloud Servce adoption
    • 4.2.3 Green Data Centers Rising Awareness of Carbon-neutrality Leading to Infrastructure Upgrades
  • 4.3 Market Restraints
    • 4.3.1 Security Challenges Impacting Growth of Data Centers
  • 4.4 Value Chain/Supply Chain Analysis
  • 4.5 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.5.1 Threat of New Entrants
    • 4.5.2 Bargaining Power of Buyers/Consumers
    • 4.5.3 Bargaining Power of Suppliers
    • 4.5.4 Threat of Substitute Products
    • 4.5.5 Intensity of Competitive Rivalry
  • 4.6 Assessment of COVID-19 Impact

5. Key Industry Statistics

  • 5.1 Planned/Under Construction IT Load Capacity
  • 5.2 Planned/Under Construction Raised Floor Space
  • 5.3 Planned/Under Construction Submarine Cable

6. MARKET SEGMENTATION

  • 6.1 By Tier Type
    • 6.1.1 Tier 1 and 2
    • 6.1.2 Tier 3
    • 6.1.3 Tier 4
  • 6.2 By Data Center Size
    • 6.2.1 Small
    • 6.2.2 Medium
    • 6.2.3 Large
    • 6.2.4 Mega
    • 6.2.5 Massive
  • 6.3 By Infrastructure
    • 6.3.1 Cooling Infrastructure
    • 6.3.1.1 Air-based Cooling
    • 6.3.1.2 Liquid-based Cooling
    • 6.3.1.3 Evaporative Cooling
    • 6.3.2 Power Infrastructure
    • 6.3.2.1 UPS Systems
    • 6.3.2.2 Generators
    • 6.3.2.3 Power Distribution Unit (PDU)
    • 6.3.3 Racks and Cabinets
    • 6.3.4 Servers
    • 6.3.5 Networking Equipment
    • 6.3.6 Physical Security Infrastructure
    • 6.3.7 Design and Consulting Services
    • 6.3.8 Other Infrastructure
  • 6.4 By End User
    • 6.4.1 IT & Telecommunication
    • 6.4.2 BFSI
    • 6.4.3 Government
    • 6.4.4 Healthcare
    • 6.4.5 Other End User

7. COMPETITIVE LANDSCAPE

  • 7.1 Company Profiles
    • 7.1.1 AECOM
    • 7.1.2 Arup Group Limited
    • 7.1.3 DPR Construction Inc.
    • 7.1.4 IBM Corporation
    • 7.1.5 Schneider Electric SE
    • 7.1.6 Kirby Group Engineering
    • 7.1.7 Coromatic AB Sweden
    • 7.1.8 Legrand SA
    • 7.1.9 Dornan(Engineering Works)
    • 7.1.10 ALFA LAVAL AB
    • 7.1.11 Per Aarsleff A/S
    • 7.1.12 Johnson Controls International PLC
    • 7.1.13 Arista Networks
    • 7.1.14 Stulz GmbH
  • *List Not Exhaustive

8. INVESTMENT ANALYSIS

9. MARKET OPPORTUNITIES AND FUTURE TRENDS

**Subject to Availability

Netherlands Data Center Construction Market Report Scope

A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, the capital expenditure incurred while building the existing data center facilities is tracked, and the future capex is estimated based on upcoming data center facilities.

The data center construction market in the Netherlands is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure [air-based cooling, liquid-based cooling, and evaporative cooling], power infrastructure [UPS systems, generators, and power distribution unit (PDU)], racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and end user (IT & telecommunication, BFSI, government, healthcare, and other end users). The market sizes and forecasts are provided in values (USD) for all the above segments.

By Tier Type
Netherlands Data Center Construction Market segmentation breakdown
Tier 1 and 2
Tier 3
Tier 4
By Data Center Size
Netherlands Data Center Construction Market segmentation breakdown
Small
Medium
Large
Mega
Massive
By Infrastructure
Netherlands Data Center Construction Market segmentation breakdown
Cooling Infrastructure Air-based Cooling
Liquid-based Cooling
Evaporative Cooling
Power Infrastructure UPS Systems
Generators
Power Distribution Unit (PDU)
Racks and Cabinets
Servers
Networking Equipment
Physical Security Infrastructure
Design and Consulting Services
Other Infrastructure
By End User
Netherlands Data Center Construction Market segmentation breakdown
IT & Telecommunication
BFSI
Government
Healthcare
Other End User
Netherlands Data Center Construction Market segmentation breakdown
By Tier Type Tier 1 and 2
Tier 3
Tier 4
By Data Center Size Small
Medium
Large
Mega
Massive
By Infrastructure Cooling Infrastructure Air-based Cooling
Liquid-based Cooling
Evaporative Cooling
Power Infrastructure UPS Systems
Generators
Power Distribution Unit (PDU)
Racks and Cabinets
Servers
Networking Equipment
Physical Security Infrastructure
Design and Consulting Services
Other Infrastructure
By End User IT & Telecommunication
BFSI
Government
Healthcare
Other End User

Key Questions Answered in the Report

How big is the Netherlands Data Center Construction Market?

The Netherlands Data Center Construction Market size is expected to reach USD 1.26 billion in 2025 and grow at a CAGR of 4.75% to reach USD 1.66 billion by 2031.

What is the current Netherlands Data Center Construction Market size?

In 2025, the Netherlands Data Center Construction Market size is expected to reach USD 1.26 billion.

Who are the key players in Netherlands Data Center Construction Market?

DPR Construction, Legrand Netherlands, Stulz Group BV, Schneider Electric and Kirby Group are the major companies operating in the Netherlands Data Center Construction Market.

What years does this Netherlands Data Center Construction Market cover, and what was the market size in 2024?

In 2024, the Netherlands Data Center Construction Market size was estimated at USD 1.20 billion. The report covers the Netherlands Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022, 2023 and 2024. The report also forecasts the Netherlands Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.

Page last updated on:

Netherlands Data Center Construction Market Report

Statistics for the 2025 Netherlands Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Netherlands Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.