Market Size of Italy Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2029 |
Historical Data Period | 2019 - 2022 |
CAGR (2024 - 2030) | 14.82 % |
Market Concentration | High |
Major Players*Disclaimer: Major Players sorted in no particular order |
Italy Data Center Construction Market Analysis
The Italy Data Center Construction Market is expected to register a CAGR of 14.82% during the forecast period.
The Italy data center construction market is projected to register a CAGR of 14.82%.
- The upcoming IT load capacity of the Italy data center construction market is expected to reach 805.2 MW by 2029.
- The country's construction of raised floor area is expected to increase to 5.36 million sq. ft by 2029. The country's total number of racks to be installed is expected to reach 268,408 units by 2029. Greater Milan will likely house the maximum number of racks by 2029.
- There are close to 19 submarine cable systems connecting Italy, and many are under construction. One such submarine cable, estimated to be built by the end of 2025, is Unitirreno Cable, which stretches over 890 Kilometers with landing points in Fiumicino, Genoa, and Mazara del Vallo in Italy.
Italy Data Center Construction Industry Segmentation
A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.
The Italy Data Center Construction Market is segmented by Tier Type (Tier 1 and 2, Tier 3, and Tier 4), by Data Center Size (Small, Medium, Large, Massive, and Mega), by Infrastructure (Cooling Infrastructure (Air-based Cooling, Liquid-based Cooling, Evaporative Cooling), Power Infrastructure (UPS Systems, Generators, Power Distribution Unit (PDU), Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, and Other Infrastructure), and End User ( IT & Telecommunication, BFSI, Government, Healthcare, and Other End User). The market sizes and forecasts are provided in values of USD for all the above segments.
Tier Type | |
Tier 1 and 2 | |
Tier 3 | |
Tier 4 |
Data Center Size | |
Small | |
Medium | |
Large | |
Mega | |
Massive |
Infrastructure | |||||
| |||||
| |||||
Racks and Cabinets | |||||
Servers | |||||
Networking Equipment | |||||
Physical Security Infrastructure | |||||
Design and Consulting Services | |||||
Other Infrastructure |
End-User | |
IT & Telecommunication | |
BFSI | |
Government | |
Healthcare | |
Other End User |
Italy Data Center Construction Market Size Summary
The Italy data center construction market is experiencing significant growth, driven by increasing demand for data processing and storage solutions across various sectors such as media, entertainment, manufacturing, BFSI, e-commerce, and government services. The market is characterized by a robust expansion in IT load capacity, raised floor area, and the number of racks, with Greater Milan emerging as a key hub due to its favorable infrastructure and technological advancements. The development of smart cities, particularly in Milan and Bergamo, is expected to further boost the demand for data centers as the proliferation of smart devices necessitates enhanced data processing capabilities. The market is also witnessing a shift towards larger data center facilities, with companies like Stack Infrastructure and Compass planning substantial expansions to meet the growing needs of their clients.
The market landscape is fairly consolidated, with major players such as AECOM, Arup Group Limited, Legrand, Daikin Applied, and STULZ leading the charge. Recent developments, including Microsoft's announcement of its first cloud region in Italy and the formation of the Italian Data Center Association, highlight the increasing investment and collaboration in the sector. These initiatives are expected to create new opportunities for vendors, as the demand for advanced data center solutions continues to rise. The presence of favorable regulations, suitable land availability, and environmental considerations further enhance the attractiveness of the Italian market for data center construction, positioning it for continued growth in the coming years.
Italy Data Center Construction Market Size - Table of Contents
-
1. Market Dynamics
-
1.1 Market Overview
-
1.2 Market Drivers
-
1.2.1 5G Developments Fuelling Data Center Investments
-
1.2.2 Growing Cloud Servce adoption
-
1.2.3 Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
-
-
1.3 Market Restraints
-
1.3.1 Security Challenges Impacting Growth of Data Centers
-
-
1.4 Value Chain / Supply Chain Analysis
-
1.5 Industry Attractiveness - Porter's Five Forces Analysis
-
1.5.1 Threat of New Entrants
-
1.5.2 Bargaining Power of Buyers/Consumers
-
1.5.3 Bargaining Power of Suppliers
-
1.5.4 Threat of Substitute Products
-
1.5.5 Intensity of Competitive Rivalry
-
-
1.6 Assessment of COVID-19 Impact
-
-
2. MARKET SEGMENTATION
-
2.1 Tier Type
-
2.1.1 Tier 1 and 2
-
2.1.2 Tier 3
-
2.1.3 Tier 4
-
-
2.2 Data Center Size
-
2.2.1 Small
-
2.2.2 Medium
-
2.2.3 Large
-
2.2.4 Mega
-
2.2.5 Massive
-
-
2.3 Infrastructure
-
2.3.1 Cooling Infrastructure
-
2.3.1.1 Air-based Cooling
-
2.3.1.2 Liquid-based Cooling
-
2.3.1.3 Evaporative Cooling
-
-
2.3.2 Power Infrastructure
-
2.3.2.1 UPS Systems
-
2.3.2.2 Generators
-
2.3.2.3 Power Distribution Unit (PDU)
-
-
2.3.3 Racks and Cabinets
-
2.3.4 Servers
-
2.3.5 Networking Equipment
-
2.3.6 Physical Security Infrastructure
-
2.3.7 Design and Consulting Services
-
2.3.8 Other Infrastructure
-
-
2.4 End-User
-
2.4.1 IT & Telecommunication
-
2.4.2 BFSI
-
2.4.3 Government
-
2.4.4 Healthcare
-
2.4.5 Other End User
-
-
Italy Data Center Construction Market Size FAQs
What is the current Italy Data Center Construction Market size?
The Italy Data Center Construction Market is projected to register a CAGR of 14.82% during the forecast period (2024-2029)
Who are the key players in Italy Data Center Construction Market?
AECOM, Arup Group Limited, Legrand, Daikin Applied and STULZ are the major companies operating in the Italy Data Center Construction Market.