Ireland Data Center Construction Market Size (2024 - 2029)

The Ireland Data Center Construction Market is poised for significant growth, with an anticipated expansion in market size over the forecast period. This growth is driven by the increasing IT load capacity and the substantial rise in the construction of raised floor areas. Additionally, the market is set to experience a surge in the number of racks installed, reflecting the growing demand for data center infrastructure. The development of submarine cable systems, such as the Celtic Norse, further underscores the expansion of connectivity and capacity in the region, contributing to the overall increase in market size.

Market Size of Ireland Data Center Construction Industry

Ireland Data Center Construction Market Summary
Study Period 2019 - 2029
Base Year For Estimation 2023
Market Size (2024) USD 2.51 Billion
Market Size (2030) USD 6.10 Billion
CAGR (2024 - 2030) 15.97 %
Market Concentration Medium

Major Players

Ireland Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Ireland Data Center Construction Market Analysis

The Ireland Data Center Construction Market size is estimated at USD 2.51 billion in 2024, and is expected to reach USD 6.10 billion by 2030, growing at a CAGR of 15.97% during the forecast period (2024-2030).

Key drivers fueling the demand for data centers in the country include rising SME adoption of cloud computing, stringent government mandates on local data security, and increased investments from domestic entities.

  • The upcoming IT load capacity of the Irish data center construction market is expected to reach 1,356 MW by 2030.
  • The country's construction of raised floor area is expected to increase by 4.8 million sq. ft by 2030.
  • The country's total number of racks to be installed is expected to reach 243k units by 2030.
  • Close to 15 submarine cable systems are connecting Ireland, and many are under construction. In 2023, the IRIS submarine cable was launched and became operational in March of the same year. Farice's third cable connects Iceland with Dublin, ensuring reliable digital communication across the northwest Atlantic.

Ireland Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Irish data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solution (PDU, transfer switches, switchgear, power panels, and components)), power backup solution (UPS and generators), service, design, and consulting, integration, and support and maintenance)), (mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling)), racks, and other mechanical infrastructure)), general construction)), tier type (Tier 1 and 2, Tier 3, and Tier 4), and end user (banking, financial services and insurance, IT and telecommunication, government, defense, healthcare, and other end users). The market size and forecasts are provided in value (USD) for all the above segments.

Market Segmentation - By Infrastructure
Market Segmentation - By Electrical Infrastructure
Power Distribution Solution
PDU - Basic and Smart - Metered and Switched solutions
Transfer Switches
Static
Automatic (ATS)
Switchgear
Low-voltage
Medium-voltage
Power Panels and Components
Other Power Panels and Components
Power Backup Solutions
UPS
Generators
Service - Design and Consulting, Integration, Support, and Maintenance
Market Segmentation - By Mechanical Infrastructure
Cooling Systems
Immersion Cooling
Direct-to-chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
Tier 1 and 2
Tier 3
Tier 4
Market Segmentation - By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region Or Segment?
Customize Now

Ireland Data Center Construction Market Size Summary

The Ireland data center construction market is experiencing significant growth, driven by the increasing adoption of cloud technologies and advancements in digital services. The market is characterized by a robust expansion in IT load capacity, raised floor area, and the number of racks, indicating a strong demand for data center infrastructure. Dublin, as the primary hub, benefits from its strategic location and favorable conditions for cooling servers, making it a focal point for colocation data centers. The government's initiatives, such as the EUR 85 million fund to support digital transformation, further bolster the market by encouraging businesses to enhance their digital capabilities. The presence of major players like Amazon Web Services and the ongoing development of submarine cable systems underscore the market's dynamic nature and its integration into global digital networks.

The market landscape is fairly consolidated, with key companies like AECOM, Arup Group Limited, and CyrusOne playing pivotal roles in the construction and expansion of data centers. The Irish government's commitment to aligning digital and green transitions is evident in its target to increase renewable energy usage, which is crucial for sustainable data center operations. Dublin's position as a leading recipient of ICT and internet infrastructure investments highlights its importance in the European market. The ongoing projects and investments in data center facilities reflect a continuous trend of growth, with significant contributions to the country's electricity usage and economic development.

Explore More

Ireland Data Center Construction Market Size - Table of Contents

  1. 1. MARKET SEGMENTATION

    1. 1.1 Market Segmentation - By Infrastructure

      1. 1.1.1 Market Segmentation - By Electrical Infrastructure

        1. 1.1.1.1 Power Distribution Solution

          1. 1.1.1.1.1 PDU - Basic and Smart - Metered and Switched solutions

          2. 1.1.1.1.2 Transfer Switches

            1. 1.1.1.1.2.1 Static

            2. 1.1.1.1.2.2 Automatic (ATS)

          3. 1.1.1.1.3 Switchgear

            1. 1.1.1.1.3.1 Low-voltage

            2. 1.1.1.1.3.2 Medium-voltage

          4. 1.1.1.1.4 Power Panels and Components

          5. 1.1.1.1.5 Other Power Panels and Components

        2. 1.1.1.2 Power Backup Solutions

          1. 1.1.1.2.1 UPS

          2. 1.1.1.2.2 Generators

        3. 1.1.1.3 Service - Design and Consulting, Integration, Support, and Maintenance

      2. 1.1.2 Market Segmentation - By Mechanical Infrastructure

        1. 1.1.2.1 Cooling Systems

          1. 1.1.2.1.1 Immersion Cooling

          2. 1.1.2.1.2 Direct-to-chip Cooling

          3. 1.1.2.1.3 Rear Door Heat Exchanger

          4. 1.1.2.1.4 In-row and In-rack Cooling

        2. 1.1.2.2 Racks

        3. 1.1.2.3 Other Mechanical Infrastructure

      3. 1.1.3 General Construction

    2. 1.2 Market Segmentation - By Tier Type

      1. 1.2.1 Tier 1 and 2

      2. 1.2.2 Tier 3

      3. 1.2.3 Tier 4

    3. 1.3 Market Segmentation - By End User

      1. 1.3.1 Banking, Financial Services, and Insurance

      2. 1.3.2 IT and Telecommunications

      3. 1.3.3 Government and Defense

      4. 1.3.4 Healthcare

      5. 1.3.5 Other End Users

Ireland Data Center Construction Market Size FAQs

The Ireland Data Center Construction Market size is expected to reach USD 2.51 billion in 2024 and grow at a CAGR of 15.97% to reach USD 6.10 billion by 2030.

In 2024, the Ireland Data Center Construction Market size is expected to reach USD 2.51 billion.

Ireland Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024 - 2029)