Hong Kong Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2025 - 2031)

Hong Kong Data Center Construction Market Report is Segmented by Tier Type (tier 1 and 2, Tier 3, and Tier 4), by Data Center Size (small, Medium, Large, Massive, and Mega), by Infrastructure (cooling Infrastructure (air-Based Cooling, Liquid-Based Cooling, Evaporative Cooling), Power Infrastructure (UPS Systems, Generators, Power Distribution Unit (PDU), Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, and Other Infrastructure), and End-User ( IT & Telecommunication, BFSI, Government, Healthcare, and Other End-User). The Market Size and Forecasts are Provided in Values of USD for all the Above Segments.

Hong Kong Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2025 - 2031)

Hong Kong Data Center Construction Market Size

Hong Kong Data Center Construction Market  Summary
Study Period 2019 - 2031
Base Year For Estimation 2024
Forecast Data Period 2025 - 2031
Market Size (2025) USD 0.76 Billion
Market Size (2031) USD 2.12 Billion
CAGR (2025 - 2031) 18.68 %
Market Concentration High

Major Players

Hong Kong Data Center Construction Market  Major Players

*Disclaimer: Major Players sorted in no particular order

Compare market size and growth of Hong Kong Data Center Construction Market with other markets in Technology, Media and Telecom Industry

Automation

Digital Commerce

Electronics

Information Technology

Media and Entertainment

Security & Surveillance

Hong Kong Data Center Construction Market Analysis

The Hong Kong Data Center Construction Market size is estimated at USD 0.76 billion in 2025, and is expected to reach USD 2.12 billion by 2031, at a CAGR of 18.68% during the forecast period (2025-2031).

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the Hong Kong data center construction market is expected to reach 1777.91 MW by 2029.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase to 6.3 million sq.ft. by 2029.
  • Planned Racks: The country's total number of racks to be installed is expected to reach 318247 units by 2029. Tseung Kwan O-Hong Kong is expected to house the maximum number of racks by 2029.
  • Planned Submarine Cables: There are close to 12 submarine cable systems connecting Hong Kong, and many are under construction. One such submarine cable that is estimated to start service in 2025 is Asia Cable Link AC, which stretches over 6000 Kilometers with landing points from Hong Kong to China.

Hong Kong Data Center Construction Industry Overview

The Hong Kong data center construction market is consolidated with a few major players, which are Aurecon, BYME Engineering, Schneider Electric, Mitsubishi Electric, and Vertiv Group.

In June 2023, AirTrunk announced to establish a second data center in Hongkong to support the demand for digital infrastructure. The company aims to establish 15 MW and expects to operate by 2024. Such investments provide opportunities for the vendors studied in the market.

In August 2023, ESR secured a Sustainability-Linked Loan (SLL) of USD 250 million to develop a data center of 21.3 MW in Hong Kong. Such developments are providing opportunities for the vendors studied in the market.

Hong Kong Data Center Construction Market Leaders

  1. Aurecon

  2. BYME Engineering

  3. Schneider Electric

  4. Mitsubishi Electric

  5. Vertiv Group

  6. *Disclaimer: Major Players sorted in no particular order
Hong Kong Data Center Construction Market  Concentration
Need More Details on Market Players and Competiters?
Download PDF

Hong Kong Data Center Construction Market News

  • November 2022: The company announced the opening of its new regional office in Kowloon, Hong Kong. The office would help the company strengthen its expansion and would cater to business needs such as engineering, construction, and sales in the Asia-Pacific region.
  • November 2022: The company announced the launch of BDx Indonesia, following the completion of a USD 300 million joint venture agreement with PT Indosat Tbk (Indosat Ooredoo Hutchison or IOH) and PT Aplikanusa Lintasarta, Big Data Exchange (BDx)

Hong Kong Data Center Construction Market Market Report - Table of Contents

1. INTRODUCTION

  • 1.1 Study Assumption & Market Definition
  • 1.2 Scope of the Study

2. Research Methodology

3. Executive Summary

4. Market Dynamics

  • 4.1 Market Overview
  • 4.2 Market Drivers
    • 4.2.1 Major Initiatives Undertaken by Governments to Promote Digital Economy and Connectivity Infrastructure
    • 4.2.2 Rising Adoption of Hyperscale Data Centers
  • 4.3 Market Restraints
    • 4.3.1 Environmental, Cost, and Workforce-related Challenges
  • 4.4 Value Chain / Supply Chain Analysis
  • 4.5 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.5.1 Threat of New Entrants
    • 4.5.2 Bargaining Power of Buyers/Consumers
    • 4.5.3 Bargaining Power of Suppliers
    • 4.5.4 Threat of Substitute Products
    • 4.5.5 Intensity of Competitive Rivalry
  • 4.6 Assessment of COVID-19 Impact

5. Key Industry Statistics

  • 5.1 Planned/Under Construction IT Load Capacity
  • 5.2 Planned/Under Construction Raised Floor Space
  • 5.3 Planned/Under Construction Submarine Cable

6. MARKET SEGMENTATION

  • 6.1 Tier Type
    • 6.1.1 Tier 1 and 2
    • 6.1.2 Tier 3
    • 6.1.3 Tier 4
  • 6.2 Data Center Size
    • 6.2.1 Small
    • 6.2.2 Medium
    • 6.2.3 Large
    • 6.2.4 Mega
    • 6.2.5 Massive
  • 6.3 Infrastructure
    • 6.3.1 Cooling Infrastructure
    • 6.3.1.1 Air-based Cooling
    • 6.3.1.2 Liquid-based Cooling
    • 6.3.1.3 Evaporative Cooling
    • 6.3.2 Power Infrastructure
    • 6.3.2.1 UPS Systems
    • 6.3.2.2 Generators
    • 6.3.2.3 Power Distribution Unit (PDU)
    • 6.3.3 Racks and Cabinets
    • 6.3.4 Servers
    • 6.3.5 Networking Equipment
    • 6.3.6 Physical Security Infrastructure
    • 6.3.7 Design and Consulting Services
    • 6.3.8 Other Infrastructure
  • 6.4 End-User
    • 6.4.1 IT & Telecommunication
    • 6.4.2 BFSI
    • 6.4.3 Government
    • 6.4.4 Healthcare
    • 6.4.5 Other End User

7. COMPETITIVE LANDSCAPE

  • 7.1 Company Profiles
    • 7.1.1 Arup Group
    • 7.1.2 Aurecon
    • 7.1.3 BYME Engineering
    • 7.1.4 DPR Construction Inc.
    • 7.1.5 Turner Construction Co
    • 7.1.6 AECOM Limited
    • 7.1.7 Kirby Group Engineering
    • 7.1.8 ABB Ltd.
    • 7.1.9 Schneider Electric SE
    • 7.1.10 Stulz GmbH
  • *List Not Exhaustive

8. INVESTMENT ANALYSIS

9. MARKET OPPORTUNITIES AND FUTURE TRENDS

**Subject to Availability
You Can Purchase Parts Of This Report. Check Out Prices For Specific Sections
Get Price Break-up Now

Hong Kong Data Center Construction Industry Segmentation

A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing DC facilities and also estimating the future capex based on upcoming DC facilities.

Hong Kong data center construction market is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure (air-based cooling, liquid-based cooling, evaporative cooling), power infrastructure (UPS systems, generators, power distribution Unit (PDU), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and end user ( IT & telecommunication, BFSI, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments.

Tier Type Tier 1 and 2
Tier 3
Tier 4
Data Center Size Small
Medium
Large
Mega
Massive
Infrastructure Cooling Infrastructure Air-based Cooling
Liquid-based Cooling
Evaporative Cooling
Power Infrastructure UPS Systems
Generators
Power Distribution Unit (PDU)
Racks and Cabinets
Servers
Networking Equipment
Physical Security Infrastructure
Design and Consulting Services
Other Infrastructure
End-User IT & Telecommunication
BFSI
Government
Healthcare
Other End User
Need A Different Region or Segment?
Customize Now

Hong Kong Data Center Construction Market Market Research Faqs

How big is the Hong Kong Data Center Construction Market?

The Hong Kong Data Center Construction Market size is expected to reach USD 0.76 billion in 2025 and grow at a CAGR of 18.68% to reach USD 2.12 billion by 2031.

What is the current Hong Kong Data Center Construction Market size?

In 2025, the Hong Kong Data Center Construction Market size is expected to reach USD 0.76 billion.

Who are the key players in Hong Kong Data Center Construction Market?

Aurecon, BYME Engineering, Schneider Electric, Mitsubishi Electric and Vertiv Group are the major companies operating in the Hong Kong Data Center Construction Market.

What years does this Hong Kong Data Center Construction Market cover, and what was the market size in 2024?

In 2024, the Hong Kong Data Center Construction Market size was estimated at USD 0.62 billion. The report covers the Hong Kong Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022, 2023 and 2024. The report also forecasts the Hong Kong Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.

Hong Kong Data Center Construction Market Industry Report

Statistics for the 2025 Hong Kong Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Hong Kong Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.

Hong Kong Data Center Construction Market Report Snapshots