Market Size of France Data Center Construction Industry
Study Period | 2019 - 2030 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2030 |
Market Size (2024) | USD 4.81 Billion |
Market Size (2030) | USD 7.68 Billion |
CAGR (2024 - 2030) | 8.11 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
France Data Center Construction Market Analysis
The France Data Center Construction Market size is estimated at USD 4.81 billion in 2024, and is expected to reach USD 7.68 billion by 2030, growing at a CAGR of 8.11% during the forecast period (2024-2030).
- Under Construction IT Load Capacity: The upcoming IT load capacity of the French data center construction market is expected to reach more than 1700 MW by 2030.
- Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by more than 6.3 thousand sq. ft by 2029.
- Planned Racks: The country's total number of racks to be installed is expected to reach more than 300 thousand units by 2030. Paris (Ile-De-France) is expected to house the maximum number of racks by 2030.
- Planned Submarine Cables: There are more than 25 submarine cable systems connecting France, and many are under construction.
France Data Center Construction Industry Segmentation
Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.
The French data center construction market is segmented by infrastructure (electrical infrastructure [power distribution solution (PDU, transfer switches, switchgear, power panels and components, and others), power back-up solution (UPS and generators), and service (design and consulting, integration, and support and maintenance)], mechanical infrastructure [cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure], and general construction), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users). The Market Sizes and Forecasts are Provided in Terms of Value (USD) and Volume () for all the Above Segments
By Infrastructure | ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
General Construction |
By Tier Type | |
Tier 1 and 2 | |
Tier 3 | |
Tier 4 |
By End User | |
Banking, Financial Services, and Insurance | |
IT and Telecommunications | |
Government and Defense | |
Healthcare | |
Other End Users |
France Data Center Construction Market Size Summary
The France data center construction market is experiencing significant growth, driven by the increasing demand for cloud computing and advancements in technologies such as artificial intelligence, big data, and blockchain. The market is characterized by a robust expansion in IT load capacity and raised floor area, with Paris (Ile-De-France) being a major hub despite a shift towards other regions for new data center establishments. The market is fairly consolidated, with key players like Arup Group, Schneider Electric, and Pure Storage leading the charge. The development of submarine cable systems, particularly in cities like Marseille, is enhancing connectivity and supporting the growth of data centers across the country.
The market's growth is further fueled by the rising adoption of cloud solutions, with significant contributions from the IT and telecom, and banking, financial services, and insurance sectors. The manufacturing industry is poised for the fastest growth, reflecting the broader trend of digital transformation across various sectors. The construction of new data centers is not only concentrated in Paris but is also expanding in other cities such as Marseille, Strasbourg, and Bordeaux, driven by the need for increased capacity and connectivity. Recent investments and partnerships, such as those by Data4 and SFR Business, highlight the ongoing opportunities and strategic developments within the French data center construction market.
France Data Center Construction Market Size - Table of Contents
-
1. MARKET SEGMENTATION
-
1.1 By Infrastructure
-
1.1.1 By Electrical Infrastructure
-
1.1.1.1 Power Distribution Solution
-
1.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions
-
1.1.1.1.2 Transfer Switches
-
1.1.1.1.2.1 Static
-
1.1.1.1.2.2 Automatic (ATS)
-
-
1.1.1.1.3 Switchgear
-
1.1.1.1.3.1 Low-voltage
-
1.1.1.1.3.2 Medium-voltage
-
-
1.1.1.1.4 Power Panels and Components
-
1.1.1.1.5 Others
-
-
1.1.1.2 Power Back-up Solutions
-
1.1.1.2.1 UPS
-
1.1.1.2.2 Generators
-
-
1.1.1.3 Service - Design and Consulting, Integration, Support and Maintenance
-
-
1.1.2 By Mechanical Infrastructure
-
1.1.2.1 Cooling Systems
-
1.1.2.1.1 Immersion Cooling
-
1.1.2.1.2 Direct-to-Chip Cooling
-
1.1.2.1.3 Rear Door Heat Exchanger
-
1.1.2.1.4 In-row and In-rack Cooling
-
-
1.1.2.2 Racks
-
1.1.2.3 Other Mechanical Infrastructure
-
-
1.1.3 General Construction
-
-
1.2 By Tier Type
-
1.2.1 Tier 1 and 2
-
1.2.2 Tier 3
-
1.2.3 Tier 4
-
-
1.3 By End User
-
1.3.1 Banking, Financial Services, and Insurance
-
1.3.2 IT and Telecommunications
-
1.3.3 Government and Defense
-
1.3.4 Healthcare
-
1.3.5 Other End Users
-
-
France Data Center Construction Market Size FAQs
How big is the France Data Center Construction Market?
The France Data Center Construction Market size is expected to reach USD 5.20 billion in 2025 and grow at a CAGR of 8.11% to reach USD 8.30 billion by 2031.
What is the current France Data Center Construction Market size?
In 2025, the France Data Center Construction Market size is expected to reach USD 5.20 billion.