Market Size of Denmark Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2029 |
Historical Data Period | 2019 - 2022 |
CAGR (2024 - 2030) | 12.44 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Need a report that reflects how COVID-19 has impacted this market and its growth?
Denmark Data Center Construction Market Analysis
The Denmark Data Center Construction Market is expected to register a CAGR of 12.44% during the forecast period.
The Denmark data center construction market is projected to register a CAGR of 12.44%.
- The upcoming IT load capacity of the Denmark data center construction market is expected to reach 332.1 MW by 2029.
- The country's construction of raised floor area is expected to increase by 1.3 million sq. ft by 2029.
- The country's total number of racks to be installed is expected to reach 63,863 units by 2029. Copenhagen is expected to house the maximum number of racks by 2029.
- There are close to 20 submarine cable systems connecting Denmark, and many are under construction. One such submarine cable, estimated to be built by the end of 2023, is Digital E4, which stretches over 70 Kilometers with landing points in Rønne, Denmark, and Tejn, Denmark.
Denmark Data Center Construction Industry Segmentation
A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.
The Denmark data center construction market is segmented by tier rype (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure (air-based cooling, liquid-based cooling, evaporative cooling), power infrastructure (UPS systems, generators, power distribution unit (PDU), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and end user ( IT & telecommunication, BFSI, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments.
Tier Type | |
Tier 1 and 2 | |
Tier 3 | |
Tier 4 |
Data Center Size | |
Small | |
Medium | |
Large | |
Mega | |
Massive |
Infrastructure | |||||
| |||||
| |||||
Racks and Cabinets | |||||
Servers | |||||
Networking Equipment | |||||
Physical Security Infrastructure | |||||
Design and Consulting Services | |||||
Other Infrastructure |
End-User | |
IT & Telecommunication | |
BFSI | |
Government | |
Healthcare | |
Other End User |
Denmark Data Center Construction Market Size Summary
The Denmark Data Center Construction Market is experiencing robust growth, driven by increasing demand for cloud computing and e-commerce services. The market is characterized by a significant expansion in IT load capacity and raised floor area, with Copenhagen emerging as a major hub due to its strategic location and business opportunities. The city's connectivity to continental Europe, Scandinavia, and the Baltic States enhances its appeal, facilitating trade and attracting investments. The presence of submarine cable systems further supports the infrastructure needed for data centers, enabling efficient data transmission and connectivity. The market is semi-consolidated, with key players like AECOM, Arup Group Limited, Legrand, Atos, and Arista Networks contributing to the development of advanced data center solutions, including innovative cooling technologies.
The cloud segment is poised for substantial growth, with a significant share of companies adopting cloud computing services, driven by advancements in artificial intelligence, big data, and blockchain technologies. The Rest of Denmark, including cities like Aarhus and Esbjerg, is also witnessing increased activity, with new fiber routes and data center infrastructure being developed to meet future traffic demands. The market's expansion is supported by strategic acquisitions and investments, such as Penta Infra's entry into the Nordic market and STACK Infrastructure's development of a new data center campus. These developments underscore Denmark's growing importance as a key player in the global data center construction industry, with a focus on sustainability and cutting-edge technology.
Denmark Data Center Construction Market Size - Table of Contents
-
1. Market Dynamics
-
1.1 Market Overview
-
1.2 Market Drivers
-
1.2.1 5G Developments Fuelling Data Center Investments
-
1.2.2 Growing Cloud Servce adoption
-
1.2.3 Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
-
-
1.3 Market Restraints
-
1.3.1 Security Challenges Impacting Growth of Data Centers
-
-
1.4 Value Chain / Supply Chain Analysis
-
1.5 Industry Attractiveness - Porter's Five Forces Analysis
-
1.5.1 Threat of New Entrants
-
1.5.2 Bargaining Power of Buyers/Consumers
-
1.5.3 Bargaining Power of Suppliers
-
1.5.4 Threat of Substitute Products
-
1.5.5 Intensity of Competitive Rivalry
-
-
1.6 Assessment of COVID-19 Impact
-
-
2. MARKET SEGMENTATION
-
2.1 Tier Type
-
2.1.1 Tier 1 and 2
-
2.1.2 Tier 3
-
2.1.3 Tier 4
-
-
2.2 Data Center Size
-
2.2.1 Small
-
2.2.2 Medium
-
2.2.3 Large
-
2.2.4 Mega
-
2.2.5 Massive
-
-
2.3 Infrastructure
-
2.3.1 Cooling Infrastructure
-
2.3.1.1 Air-based Cooling
-
2.3.1.2 Liquid-based Cooling
-
2.3.1.3 Evaporative Cooling
-
-
2.3.2 Power Infrastructure
-
2.3.2.1 UPS Systems
-
2.3.2.2 Generators
-
2.3.2.3 Power Distribution Unit (PDU)
-
-
2.3.3 Racks and Cabinets
-
2.3.4 Servers
-
2.3.5 Networking Equipment
-
2.3.6 Physical Security Infrastructure
-
2.3.7 Design and Consulting Services
-
2.3.8 Other Infrastructure
-
-
2.4 End-User
-
2.4.1 IT & Telecommunication
-
2.4.2 BFSI
-
2.4.3 Government
-
2.4.4 Healthcare
-
2.4.5 Other End User
-
-
Denmark Data Center Construction Market Size FAQs
What is the current Denmark Data Center Construction Market size?
The Denmark Data Center Construction Market is projected to register a CAGR of 12.44% during the forecast period (2024-2029)
Who are the key players in Denmark Data Center Construction Market?
Arup, Aecom, Atos, Legrand and Arista Networks are the major companies operating in the Denmark Data Center Construction Market.