China Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2025 - 2031)

The China Data Center Construction Market report segments the industry into By Infrastructure (By Electrical Infrastructure, By Mechanical Infrastructure, General Construction), By Tier Type (Tier 1 and 2, Tier 3, Tier 4), and By End User (Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users).

China Data Center Construction Market Size and Share

China Data Center Construction Market Summary
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

China Data Center Construction Market Analysis by Mordor Intelligence

The China Data Center Construction Market size is estimated at USD 10.05 billion in 2025, and is expected to reach USD 17.07 billion by 2031, at a CAGR of 9.23% during the forecast period (2025-2031).

China houses more than 120 data center facilities, and it holds a majority in Asia-Pacific. The country's demand for newer data centers is due to the growing adoption of cloud computing, the Internet of Things (IoT), and artificial intelligence (AI).

  • The upcoming IT load capacity in the country is projected to cross 3,400 MW by 2030, boosting the demand for data center racks.
  • The construction of raised floor area for data centers in the country is expected to reach 12.5 million sq. ft by 2030 for under construction raised floor space.
  • The country's total number of installed racks will reach 620k units by 2030.
  • Currently, five submarine cable projects are under construction in the country. One such submarine cable is Asia Direct Cable (ADC), stretching over 9,800 kilometers with landing points in Chung Hom Kok, China, and Shantou, China, expected to come into service from Q4 2024.
600+
data center reports by Mordor Intelligence
covering AI facilities, servers, power and more - global, regional or country-level, right down to individual data center components
See more reports  ↓

Competitive Landscape

The Chinese data center construction market is moderately fragmented, with the top five companies occupying most of the market share. The major players in this market are AECOM, DPR Construction, Aurecon Group Pty Ltd, Goodman Group, and Turner & Townsend.

  • SpaceDC, a forward-thinking data center provider headquartered in Singapore, has forged a strategic partnership with Centrin Data, a prominent tier 4 data center and network provider across China. This collaboration entails joint efforts to market Centrin Data's data centers and services within China, notably spotlighting Wuhan and Kunshan facilities, which boast a robust clientele in the financial sector. These data centers span a combined area of 206,532.41 m2 and can accommodate up to 40,000 racks. The development is planned in two stages, aiming for a total capacity of 225 MW, with the initial phase set at 70 MW. The facility is expected to come into operation during the forecast period.

China Data Center Construction Industry Leaders

  1. AECOM

  2. DPR Construction

  3. Aurecon Group Pty Ltd.

  4. Goodman Group

  5. Turner & Townsend

  6. *Disclaimer: Major Players sorted in no particular order
China Data Center Construction Market Concentration
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Recent Industry Developments

  • August 2023: Chindata Group announced plans to establish new data center facilities CN 22 (28 MW) and CN 23 (26 MW), expected to go live in Q2 2024 and Q1 2025, respectively.
  • February 2023: CapitaLand Investment Limited, in collaboration with CapitaLand China Data Centre Partners (CDCP), unveiled plans to construct hyperscale data centers in Greater Beijing. The initiative is set to deliver over 100 MW of capacity by 2025, bolstering the region's data infrastructure. Notably, these data centers are designed to focus on sustainability, aiming to achieve LEED Gold certification, underscoring CapitaLand's commitment to environmental responsibility. This move enhances the region's data capabilities and opens up new avenues for vendors in the market.

Table of Contents for China Data Center Construction Industry Report

1. INTRODUCTION

  • 1.1 Study Assumptions And Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

  • 2.1 Research Framework
  • 2.2 Secondary Research
  • 2.3 Primary Research
  • 2.4 Data Triangulation and Insight Generation

3. EXECUTIVE SUMMARY

4. MARKET INSIGHT

  • 4.1 Market Overview
  • 4.2 Market Dynamics
    • 4.2.1 Market Drivers
    • 4.2.1.1 China Initiatives to Increase the Computing Power Drives the Demand for Data Center Construction
    • 4.2.1.2 The Chinese Government's Initiatives to Modernize in the Digital Era are Fueling a Heightened Demand for Data Centers Across the Nation
    • 4.2.2 Market Restraints
    • 4.2.2.1 High Power Consumption and Emission Contribution of Data Centers
  • 4.3 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.3.1 Bargaining Power of Suppliers
    • 4.3.2 Bargaining Power of Consumers
    • 4.3.3 Threat of New Entrants
    • 4.3.4 Threat of Substitutes
    • 4.3.5 Intensity of Competitive Rivalry
  • 4.4 Key China Data Center Construction Statistics
    • 4.4.1 Number of Data Centers In the China, 2022 and 2023
    • 4.4.2 Data Center Under Construction in the China, in MW, 2024-2029
    • 4.4.3 Average Capex and Opex For the China Data Center Construction
    • 4.4.4 Data Center Power Capacity Absorption In MW, Selected Cities, China, 2022 and 2023
    • 4.4.5 The Top CAPEX Spenders on Data Center Infrastructure in China

5. MARKET SEGMENTATION

  • 5.1 Market Segmentation - By Infrastructure
    • 5.1.1 Market Segmentation - By Electrical Infrastructure
    • 5.1.1.1 Power Distribution Solution
    • 5.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions
    • 5.1.1.1.2 Transfer Switches
    • 5.1.1.1.2.1 Static
    • 5.1.1.1.2.2 Automatic (ATS)
    • 5.1.1.1.3 Switchgear
    • 5.1.1.1.3.1 Low-voltage
    • 5.1.1.1.3.2 Medium-voltage
    • 5.1.1.1.4 Power Panels and Components
    • 5.1.1.1.5 Other Infrastructure
    • 5.1.1.2 Power Back-up Solutions
    • 5.1.1.2.1 UPS
    • 5.1.1.2.2 Generators
    • 5.1.1.3 Service - Design and Consulting, Integration, Support and Maintenance
    • 5.1.2 Market Segmentation - By Mechanical Infrastructure
    • 5.1.2.1 Cooling Systems
    • 5.1.2.1.1 Immersion Cooling
    • 5.1.2.1.2 Direct-to-chip Cooling
    • 5.1.2.1.3 Rear Door Heat Exchanger
    • 5.1.2.1.4 In-row and In-rack Cooling
    • 5.1.2.1.5 Racks
    • 5.1.2.1.6 Other Mechanical Infrastructure
    • 5.1.3 General Construction
  • 5.2 Market Segmentation - By Tier Type
    • 5.2.1 Tier 1 and 2
    • 5.2.2 Tier 3
    • 5.2.3 Tier 4
  • 5.3 Market Segmentation - By End User
    • 5.3.1 Banking, Financial Services, and Insurance
    • 5.3.2 IT and Telecommunications
    • 5.3.3 Government and Defense
    • 5.3.4 Healthcare
    • 5.3.5 Other End Users

6. COMPETITIVE LANDSCAPE

  • 6.1 Company Profiles
    • 6.1.1 AECOM
    • 6.1.2 DPR Construction
    • 6.1.3 Aurecon Group Pty Ltd
    • 6.1.4 Goodman Group
    • 6.1.5 Turner & Townsend
    • 6.1.6 DSCO Group Pte Ltd
    • 6.1.7 Hensel Phelps
    • 6.1.8 HP Construction
    • 6.1.9 M+W Shanghai Co. Ltd
    • 6.1.10 Gammon Construction Limited
  • *List Not Exhaustive

7. INVESTMENTS ANALYSIS

8. MARKET OPPORTUNITIES AND FUTURE TRENDS

9. ABOUT US

  • 9.1 Industries Covered
  • 9.2 Illustrative List of Clients in the Industry
  • 9.3 Our Customized Research Capabilities
**Subject to Availability

China Data Center Construction Market Report Scope

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Chinese data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solution (PDU, transfer switches, switchgear, power panels and components, and other infrastructure)), power back-up solution (UPS and generators), service - design and consulting, integration, and support and maintenance)), (mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, in-row and in-rack cooling)), racks, and other mechanical infrastructure)), general construction)), tier type (tier 1 and 2, tier 3, and tier 4), end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users). The report offers market sizes and forecasts in USD values for all the above segments.

Market Segmentation - By Infrastructure
China Data Center Construction Market segmentation breakdown
Market Segmentation - By Electrical Infrastructure Power Distribution Solution PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Infrastructure
Power Back-up Solutions UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
China Data Center Construction Market segmentation breakdown
Tier 1 and 2
Tier 3
Tier 4
Market Segmentation - By End User
China Data Center Construction Market segmentation breakdown
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
China Data Center Construction Market segmentation breakdown
Market Segmentation - By Infrastructure Market Segmentation - By Electrical Infrastructure Power Distribution Solution PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Infrastructure
Power Back-up Solutions UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type Tier 1 and 2
Tier 3
Tier 4
Market Segmentation - By End User Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users

Key Questions Answered in the Report

How big is the China Data Center Construction Market?

The China Data Center Construction Market size is expected to reach USD 10.05 billion in 2025 and grow at a CAGR of 9.23% to reach USD 17.07 billion by 2031.

What is the current China Data Center Construction Market size?

In 2025, the China Data Center Construction Market size is expected to reach USD 10.05 billion.

Who are the key players in China Data Center Construction Market?

AECOM, DPR Construction, Aurecon Group Pty Ltd., Goodman Group and Turner & Townsend are the major companies operating in the China Data Center Construction Market.

What years does this China Data Center Construction Market cover, and what was the market size in 2024?

In 2024, the China Data Center Construction Market size was estimated at USD 9.12 billion. The report covers the China Data Center Construction Market historical market size for years: 2021, 2022, 2023 and 2024. The report also forecasts the China Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.

Page last updated on:

China Data Center Construction Market Report

Statistics for the 2025 China Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. China Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.

More reports on data centers