Canada Data Center Construction Market Size (2024 - 2029)

The Canada Data Center Construction Market is projected to experience significant growth over the forecast period, with its market size expanding substantially. This growth is driven by the development of IT load capacity, raised floor space, and the installation of a large number of racks, particularly concentrated in Quebec. Additionally, the construction of submarine cable systems, including major projects like the Leif Ericson cable, is set to enhance connectivity, further contributing to the market's expansion.

Market Size of Canada Data Center Construction Industry

Canada Data Center Construction Market Summary
Study Period 2024 - 2030
Base Year For Estimation 2023
Market Size (2024) USD 3.02 Billion
Market Size (2030) USD 5.52 Billion
CAGR (2024 - 2030) 10.60 %
Market Concentration Medium

Major Players

Canada Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Canada Data Center Construction Market Analysis

The Canada Data Center Construction Market size is estimated at USD 3.02 billion in 2024, and is expected to reach USD 5.52 billion by 2030, growing at a CAGR of 10.60% during the forecast period (2024-2030).

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the Canadian data center construction market is expected to reach more than 1220 MW by 2030
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to reach more than 5.8 million sq. ft by 2030.
  • Planned Racks: The country's total number of racks to be installed is expected to reach more than 289 thousand units by 2030. Quebec is expected to house the maximum number of racks in six years.
  • Planned Submarine Cables: Close to 12 submarine cable systems are connecting Canada, with many under construction. One such submarine cable, estimated to be built by the end of the next three years, is Leif Ericson, which stretches over 4200 km with landing points in Goose Bay, NL, Canada.

Canada Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Canadian data center construction market is segmented by infrastructure (electrical infrastructure [power distribution solution (PDU, transfer switches, switchgear, power panels and components, and others), power back-up solution (UPS and generators), and service (design and consulting, integration, and support and maintenance)], mechanical infrastructure [cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure], and general construction), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users).

By Infrastructure
By Electrical Infrastructure
Power Distribution Solution
PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches
Static
Automatic (ATS)
Switchgear
Low-voltage
Medium-voltage
Power Panels and Components
Others
Power Back-up Solutions
UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
By Mechanical Infrastructure
Cooling Systems
Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
By Tier Type
Tier 1 and 2
Tier 3
Tier 4
By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region Or Segment?
Customize Now

Canada Data Center Construction Market Size Summary

The Canada Data Center Construction Market is poised for significant growth, driven by increasing demand across various sectors such as media and entertainment, manufacturing, BFSI, and e-commerce. The market is characterized by a robust expansion in IT load capacities, raised floor space, and the installation of racks, with Quebec emerging as a key hub due to its favorable conditions like renewable energy, cold climate, and economic incentives. The province's strategic advantages have attracted major players, contributing to its substantial market share. The growing trend of digitalization, including online shopping and streaming services, is further propelling the demand for data centers, with Quebec and Ontario leading the charge in market presence.

The market landscape is moderately consolidated, with prominent companies like AECOM, DPR Construction, NetApp, Hewlett Packard Enterprise, and Dell Technologies playing significant roles. Recent developments, such as Cologix's Scalelogix facility and Equinix's new data center in Montreal, highlight the ongoing investments and expansions in the sector. These initiatives are expected to create new opportunities for vendors, enhancing connectivity and capacity across Canada. The collaboration between global platforms and local data center companies, such as NetIX and eStruxture, underscores the market's focus on expanding global connectivity solutions. As the demand for data processing and smart services continues to rise, the Canada Data Center Construction Market is set to experience robust growth in the coming years.

Explore More

Canada Data Center Construction Market Size - Table of Contents

  1. 1. MARKET SEGMENTATION

    1. 1.1 By Infrastructure

      1. 1.1.1 By Electrical Infrastructure

        1. 1.1.1.1 Power Distribution Solution

          1. 1.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions

          2. 1.1.1.1.2 Transfer Switches

            1. 1.1.1.1.2.1 Static

            2. 1.1.1.1.2.2 Automatic (ATS)

          3. 1.1.1.1.3 Switchgear

            1. 1.1.1.1.3.1 Low-voltage

            2. 1.1.1.1.3.2 Medium-voltage

          4. 1.1.1.1.4 Power Panels and Components

          5. 1.1.1.1.5 Others

        2. 1.1.1.2 Power Back-up Solutions

          1. 1.1.1.2.1 UPS

          2. 1.1.1.2.2 Generators

        3. 1.1.1.3 Service - Design and Consulting, Integration, Support and Maintenance

      2. 1.1.2 By Mechanical Infrastructure

        1. 1.1.2.1 Cooling Systems

          1. 1.1.2.1.1 Immersion Cooling

          2. 1.1.2.1.2 Direct-to-Chip Cooling

          3. 1.1.2.1.3 Rear Door Heat Exchanger

          4. 1.1.2.1.4 In-row and In-rack Cooling

        2. 1.1.2.2 Racks

        3. 1.1.2.3 Other Mechanical Infrastructure

      3. 1.1.3 General Construction

    2. 1.2 By Tier Type

      1. 1.2.1 Tier 1 and 2

      2. 1.2.2 Tier 3

      3. 1.2.3 Tier 4

    3. 1.3 By End User

      1. 1.3.1 Banking, Financial Services, and Insurance

      2. 1.3.2 IT and Telecommunications

      3. 1.3.3 Government and Defense

      4. 1.3.4 Healthcare

      5. 1.3.5 Other End Users

Canada Data Center Construction Market Size FAQs

The Canada Data Center Construction Market size is expected to reach USD 3.02 billion in 2024 and grow at a CAGR of 10.60% to reach USD 5.52 billion by 2030.

In 2024, the Canada Data Center Construction Market size is expected to reach USD 3.02 billion.

Canada Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)