Australia Data Center Construction Market Size (2024 - 2029)

The Australia Data Center Construction Market is experiencing growth driven by government initiatives and increased investment from data center providers. The transition to third-party, multi-tenant data centers, as outlined in the Australia Government Data Centre Strategy, is a key factor in this expansion. The market is further propelled by the development of new data centers utilizing renewable energy sources, addressing environmental concerns. Despite challenges such as cybersecurity threats and supply chain disruptions, the demand for cloud computing and the essential nature of construction in maintaining economic stability continue to support the market's expansion.

Australia Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2025 - 2031)

Australia Data Center Construction Market Size

Australia Data Center Construction Market Summary
Study Period 2019 - 2030
Base Year For Estimation 2023
Forecast Data Period 2024 - 2030
Market Size (2024) USD 10.60 Billion
Market Size (2030) USD 14.60 Billion
CAGR (2024 - 2030) 4.91 %
Market Concentration Medium

Major Players

Australia Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Australia Data Center Construction Market Analysis

The Australia Data Center Construction Market size is estimated at USD 10.60 billion in 2024, and is expected to reach USD 14.60 billion by 2030, growing at a CAGR of 4.91% during the forecast period (2024-2030).

Under Construction IT Load Capacity: The upcoming IT load capacity of the Australian data center construction market is expected to reach more than 3200 MW by 2030

Under Construction Raised Floor Space: The country's construction of raised floor space is expected to reach more than 11.4 thousand sq. ft by 2030.

Planned Racks: The country's total number of racks to be installed is expected to reach more than 570 thousand units by 2030.

Planned Submarine Cables: There are more than 20 submarine cable systems connecting Australia, and many are under construction.

Australia Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Australian data center construction market is segmented by infrastructure (electrical infrastructure [power distribution solution (PDU, transfer switches, switchgear, power panels and components, and others), power back-up solution (UPS and generators), and service (design and consulting, integration, and support and maintenance)], mechanical infrastructure [cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure], and general construction), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users).

By Infrastructure
By Electrical Infrastructure Power Distribution Solution PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Others
Power Back-up Solutions UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
By Tier Type
Tier 1 and 2
Tier 3
Tier 4
By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region or Segment?
Customize Now

Australia Data Center Construction Market Size Summary

The Australian data center construction market is experiencing significant growth, driven by government initiatives and the increasing demand for cloud computing. The Australia Government Data Centre Strategy 2010-2025 is facilitating a shift towards third-party, multi-tenant data centers, optimizing resource utilization. This transition is supported by strategic acquisitions and investments by data center providers, such as Equinix's acquisition of Metronode's assets, which expanded their capacity significantly. The market is also witnessing the development of new data centers powered by renewable energy sources, exemplified by projects like Project Koete, which aims to provide 100% renewable energy access. Despite concerns over cybersecurity and physical security challenges, the market continues to expand, with construction projects classified as essential during the COVID-19 pandemic, although supply chain disruptions have posed challenges.

The telecommunications sector in Australia is undergoing transformative changes, with the deployment of 5G technology in major cities and the auctioning of spectrum bands to enhance service offerings. This expansion is expected to drive the growth of the data center market, as increased connectivity and capacity are required to support new applications and services. The market is fairly consolidated, with major players like Icon Co, Eaton Corporation plc, and Schneider Electric SE dominating the landscape. Recent investments, such as Microsoft's planned data center campus in Sydney and Leaseweb's expansion in the Asia Pacific region, highlight the ongoing growth and development in the sector. The market's expansion is further supported by strategic partnerships and contracts, such as Canberra Data Centres' significant deal with the Defence department, underscoring the critical role of data centers in Australia's digital infrastructure.

Explore More

Australia Data Center Construction Market Size - Table of Contents

1. MARKET SEGMENTATION

  • 1.1 By Infrastructure
    • 1.1.1 By Electrical Infrastructure
    • 1.1.1.1 Power Distribution Solution
    • 1.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions
    • 1.1.1.1.2 Transfer Switches
    • 1.1.1.1.2.1 Static
    • 1.1.1.1.2.2 Automatic (ATS)
    • 1.1.1.1.3 Switchgear
    • 1.1.1.1.3.1 Low-voltage
    • 1.1.1.1.3.2 Medium-voltage
    • 1.1.1.1.4 Power Panels and Components
    • 1.1.1.1.5 Others
    • 1.1.1.2 Power Back-up Solutions
    • 1.1.1.2.1 UPS
    • 1.1.1.2.2 Generators
    • 1.1.1.2.3 Service - Design and Consulting, Integration, Support and Maintenance
    • 1.1.2 By Mechanical Infrastructure
    • 1.1.2.1 Cooling Systems
    • 1.1.2.1.1 Immersion Cooling
    • 1.1.2.1.2 Direct-to-Chip Cooling
    • 1.1.2.1.3 Rear Door Heat Exchanger
    • 1.1.2.1.4 In-row and In-rack Cooling
    • 1.1.2.2 Racks
    • 1.1.2.3 Other Mechanical Infrastructure
    • 1.1.3 General Construction
  • 1.2 By Tier Type
    • 1.2.1 Tier 1 and 2
    • 1.2.2 Tier 3
    • 1.2.3 Tier 4
  • 1.3 By End User
    • 1.3.1 Banking, Financial Services, and Insurance
    • 1.3.2 IT and Telecommunications
    • 1.3.3 Government and Defense
    • 1.3.4 Healthcare
    • 1.3.5 Other End Users

Australia Data Center Construction Market Research FAQs

How big is the Australia Data Center Construction Market?

The Australia Data Center Construction Market size is expected to reach USD 11.12 billion in 2025 and grow at a CAGR of 4.91% to reach USD 14.83 billion by 2031.

What is the current Australia Data Center Construction Market size?

In 2025, the Australia Data Center Construction Market size is expected to reach USD 11.12 billion.